Problems in Regression Analysis

Problems in Regression Analysis. Heteroscedasticity Violation of the constancy of the variance of the errors. Cross-sectional data Serial Correlation Violation of uncorrelated error terms Time-series data. Heteroscedasticity.

aideen
Download Presentation

Problems in Regression Analysis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Problems in Regression Analysis • Heteroscedasticity • Violation of the constancy of the variance of the errors. • Cross-sectional data • Serial Correlation • Violation of uncorrelated error terms • Time-series data

  2. Heteroscedasticity • The OLS model assumes homoscedasticity, i.e., the variance of the errors is constant. In some regressions, especially in cross-sectional studies, this assumption may be violated. • When heteroscedasticity is present, OLS estimation puts more weight on the observations which have large error variances than on those with small error variances. • The OLS estimates are unbiased but they are inefficient but have larger than minimum variance.

  3. Tests of Heteroscedasticity • Lagrange Multiplier Tests • Goldfeld-Quant Test • White’s Test

  4. Goldfeld-Quant Test • Order the data by the magnitude of the independent variable, X, which is thouth to be related to the error variance. • Omit the middle d observations. (d might be 1/5 of the total sample size) • Fit two separate regressions; one for the low values, another for the high values • Calculate ESS1 and ESS2 • Calculate

  5. Problem • Salvatore – Data on income and consumption

  6. Problem

  7. Problem Regression on the whole sample: Regressions on the first twelve and last twelve observations:

  8. To Correct for Heteroscedasticity • To correct for heteroscedasticity of the form Var(ei)=CX2, where C is a nonzero constant, transform the variables by dividing through by the problematic variable. • In the two variable case, • The transformed error term is now homoscedastic

  9. Problem

  10. Serial Correlation • This is the problem which arises in OLS estimation when the errors are not independent. • The error term in one period is correlated with error terms in previous periods. • If ei is correlated with ei-1, then we say there is first order serial correlation. • Serial correlation may be positive or negative. • E(ei,ei-1)>0 • E(ei,ei-1)<0

  11. Serial Correlation • If serial correlation is present, the OLS estimates are still unbiased and consistent, but the standard errors are biased, leading to incorrect statistical tests and biased confidence intervals. • With positive serial correlation, the standard errors of bhat is biased downward, leading to higher t stats • With negative serial correlation, the standard errors of bhat is biased upward, leading to lower t stats

  12. Durbin-Watson Statistic 0 dL dU 2 4-dU 4-dL 4 +SC inconcl no serial correlation inconcl -SC

  13. Problem • Data 9-4 shows corporate profits and sales in billions of dollars for the manufacturing sector of the U.S. from 1974 to 1994. • Estimate the equation Profits = b1+b2Sales + e • Test for first-order serial correlation.

  14. Problem • OLS Estimate of Profit as a function of Sales:

  15. Problem • Test for serial correlation • SPSS

  16. Correcting for Serial Correlation • We assume: • Where ut is distributed normally with a zero mean and constant variance. • Follow a Durbin Procedure

  17. Correcting for Serial Correlation

  18. Correcting for Serial Correlation • Move the lagged dependent variable term to the right-hand side and estimate the equation using OLS. The estimated coefficient on the lagged dependent variable is r.

  19. Correcting for Serial Correlation • Create new independent and dependent variables by the following process: • Estimate the following equation:

  20. Correcting for Serial Correlation • The estimates of the slope coefficients are the same (but corrected for serial correlation) as in the original equation. • The constant of the regression on the transformed variables is

  21. Problem • Begin by regressing Profit (p) on Profit lagged one period, Sales, and Sales lagged one period. • The estimated coefficient on the lagged dependent variable is r.

  22. Problem • r = .49

  23. Problem • Then generate the transformed (starred) variables. • Run regression on transformed variables • Profit*=.167+.042 Sales* • Profit = .327 +.027 Sales • With no serial correlation