Design Work Coordination By Deputy General Manager (P&D)
Contract Documents Completed by P&D SectionUnder Local Bank Funding
Contract Documents Completed by P&D SectionUnder Local Bank Funding
Type drawings • Culvert Crossings – For uPVC/DI/PE Pipes for • Concrete Thrust Blocks from Dia. 80 to 700mm for uPVC/DI/PE fittings • Bedding Types and Backfillings for DI/uPVC/PE Mains • Air Valves for uPVC (63mm dia. – 225mm) /DI (80mm – 1200mm dia.) /PE Mains (upto 630mm dia.) • Washout Valves for uPVC (63mm dia. – 225mm) /DI (80mm – 1200mm dia.) /PE Mains (upto 630mm dia.) • Inline Sluice/Butterfly Valves for uPVC (63mm dia. – 225mm) /DI (80mm – 1200mm dia.) /PE Mains (upto 630mm dia.) • Railway Crossings for uPVC/DI/PE Mains • Marker Posts • Service Connections for 20, 25,32,50,63mm dia PE Connections Resources to be shared with RSC’s
Estimate Preparation • Rate Book (Water and Sewerage) for year 2014 • Assistance on guidelines, factors such as • Availability of utilities in the roads which may be unforseen or foreseen. • Difficulty in storing materials near by the trench • Heavy traffic load on roads • Backfilling with sand or quarry dust or ABC in main roads • Imported soils • Shoring of entire trench • Additional bedding materials • Night works Resources to be shared with RSC’s
Type Drawings for Structures • Type Bill of Quantities for Supply and Civil Contracts • Assistance in Surveying Works – three surveyors are available Resources to be shared with RSC’s