1 / 8

COUNTRY REPORT ON IPP, MALAWI

COUNTRY REPORT ON IPP, MALAWI. MVIHA, PJZ. ENTRY POINTS. ENTRY POINTS. Border posts Muloza border post Mwanza border post Dedza border post Mchinji border post Songwe border post International airports Chileka Airport in the South Kamuzu International Airport.

aimee
Download Presentation

COUNTRY REPORT ON IPP, MALAWI

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. COUNTRY REPORT ON IPP, MALAWI MVIHA, PJZ

  2. ENTRY POINTS

  3. ENTRY POINTS • Border posts • Muloza border post • Mwanza border post • Dedza border post • Mchinji border post • Songwe border post • International airports • Chileka Airport in the South • Kamuzu International Airport

  4. MALAWI NPPO ORGANIZATIONAL STRUCTURE

  5. MALAWI NPPO ORGANIZATIONAL STRUCTURE • International Airports in South and Central, where Plant Inspectors are based and report to the PPO, south and central • Inspectors at boarder posts report to their respective PPO • PPO office also responsible for issuance of phytosanitary certificates • Divisional Crops Officers report on whatever takes place at farmer level

  6. Data available • Army worm • Over 100 Pheromone traps. • The Divisional Crops Officers in the three regions responsible for collecting the data from the different areas and sending it to National Research Coordinator for decision making. • Report are submitted at monthly interval • Red locust • Surveillance trips are conducted every year before in traditional egg laying sites. • Lake Chilwa in the southern region and Ngolowindo, Salima in the central region.

  7. Capacity Building • Internet infrastructure. ( Inadequate Electronic communication structures) • Internet – Departmental Headquarters • The Department of Research has one internet terminal, which in most cases, is only available for use by the Director. • Need to improve on the accessibility of internet facility to Plant Protection Officers in the different regions. 2. Internet – Coordinator • The National Research Coordinator has an internet terminal which needs to be connected to the regional offices 3. Government Wide Area Network (GWAN) (Proposal) • Currently there is a proposal for a Government Wide Area

  8. Other Capacity building needs • Train staff on quarantine, produce inspection and epidemiology • Train staff on IPPC • Infrastructure development. • There is a need to improve on laboratory equipment

More Related