1 / 18

SUSTAINABLE SITE DEVELOPMENT at SIMPSON 10 Hassacarr Close, Chessingham Park, Dunnington

Explore Simpson's sustainable site development featuring FSC timber, solar reduction technologies, greywater recycling, waste wood management, renewable energy systems, eco-friendly practices, and energy savings.

aimeel
Download Presentation

SUSTAINABLE SITE DEVELOPMENT at SIMPSON 10 Hassacarr Close, Chessingham Park, Dunnington

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SUSTAINABLE SITE DEVELOPMENT at SIMPSON 10 Hassacarr Close, Chessingham Park, Dunnington Before and After

  2. FSC Timber Briese Soleil & Window Film reduces Solar Gain Newt Fence Grey Water from roofs stored and used in toilets – Saving approx. 200 m3 of Mains Water per year Waste Wood chipped and blown into Silo Biomass Boiler Grasscrete & Sustainable underground drainage System Photo voltaic layer to run air conditioning Zone Control of low energy light fittings Solar Panels for domestic heating Hybrid Cars Recycled and Re-use warehouse • Re used materials • Computer Floors • Glass • Radiators • Ironmongery Building management system & Air to Air Heat Recovery BMS conditions air and introduces ambient air on demand Eliminate Waste Wood

  3. BEFORE

  4. SOUTH ELEVATION OF UNIT C - FORMER WAREHOUSE OWNED BY GENUS

  5. VIEW SOUTH OF UNIT C LOOKING WEST ALONG SOUTH ELEVATION VIEW SOUTH OF UNIT C LOOKING WEST ALONG SOUTH ELEVATION

  6. VIEW OF WEST ELEVATION OF UNIT B, LOOKING SOUTH TOWARDS CHESSINGHAM PARK ROAD

  7. OTHER SITE VIEWS SHOWING UNIT B AND NEW OFFICE AREA

  8. CURRENT

  9. PHOTO VOLTAIC ROOF PANELS

  10. FRONT ELEVATION OF NEW SIMPSON OFFICE, FORMERLY UNIT C

  11. VIEW OF DEVELOPMENT FROM ENTRANCE GATE UNIT C – 10 HASSACARR CLOSE UNIT B CONCEPT SHOWING COMPLETED ENTRANCE NEW OFFICE UNITS 1 - 5 NEW OFFICE UNITS 6 - 9

  12. MAIN ENTRANCE TO NEW OFFICE

  13. RECEPTION AND INTERIORS OF NEW OFFICE

  14. ENERGY SAVINGS

  15. Energy Performance Certificate Breeam Certificate

  16. PHOTO VOLTAIC ROOF PANELS

  17. DISPLAY CONSOLE SHOWING POWER GENERATED AND CO2 SAVED, AND TOTAL ENERGY GENERATED

More Related