Audubon Park

Audubon Park . Road Maintenance & Planning. Asphalt failure types. ALLIGATOR CRACKING – AS SEEN ON CARDINAL. Asphalt failure types. LONGITUDINAL CRACKING. Asphalt failure types. TRANSVERSE CRACKING . Asphalt failure types. POTHOLEING – AS SEEN ON EAGLE PASS. Asphalt maintenance.

aine
Download Presentation

Audubon Park

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Audubon Park Road Maintenance & Planning

  2. Asphalt failure types • ALLIGATOR CRACKING – AS SEEN ON CARDINAL

  3. Asphalt failure types • LONGITUDINAL CRACKING

  4. Asphalt failure types • TRANSVERSE CRACKING

  5. Asphalt failure types • POTHOLEING – AS SEEN ON EAGLE PASS

  6. Asphalt maintenance • Per the American Association of State Highway and Transportation Officials (AASHTO) every $1 spent to keep a road in good condition avoids $6-14 needed later to rebuild the same road once it has deteriorated significantly. AUDUBON PARK

  7. Audubon Roads (today) • FINANCIAL LIMITATIONS • ROAD REHABILITATION & RECONSTRUCTION => EXPENSIVE • ANNUAL STATE GAS TAX REVENUES ~ $36,000 • AUDUBON PARK ROAD CONDITIONS • SIGNIFICANT ALLIGATOR CRACKING • SIGNIFICANT TRANSVERSE AND LONGITUDINAL CRACKING • SIGNIFICANT POTHOLEING • FEW ROADS ARE IN GOOD/FAIR CONDITION

  8. options 1. RECONSTRUCT AUDUBON PARK ROAD SYSTEM (COMPLETE) 2. PHASED ROAD REPLACEMENT (SECTION/YEAR) • 18 PRIMARY ROADS, WHICH CAN BE BROKEN UP INTO 34 SMALLER SEGMENTS • PROJECTED AVERAGE COST: • ROAD SEGMENT RECONSTRUCTION COST: ~$30K AVERAGE • CONTINUED ROAD MAINTANANCE: ~$20K/YEAR • PROS • A NEW ROAD EVERY YEAR • CONS • TOTAL TIME TO REPLACE EVERY ROAD IS EXCESSIVE • TOTAL HIGHER AGGREGATED COST DUE TO CONTINUED MAINTENANCE • PROJECTED COST - 2014: $1.5 MILLION +/- • PROJECTED ANNUAL OBLIGATIONS • 10YR @ 5%: ~$191,000 • PROJECTED 10/15 YEAR COST: • 10 YEAR: ~$2,000,000 (LOAN & ROUTINE MAINTENANCE) • PROS • REDUCED MAINTENANCE COSTS OVER THE NEXT 10 YEARS • AESTHETICALLY PLEASING • CONS • HIGH INITIAL COST

  9. options 3. PATCH, SEAL & RECONSTRUCT COMPLETE WITHIN 5+ YEARS. REQUIREMENTS • 36,000/YEAR FROM STATE TAX REVENUE • 5+ YEARS TO ALLOW DEVELOPMENT OF A $200,000/YR ROAD FUND FOR FINANCING OF COMPLETE ROAD SYSTEM. • PROJECTED COST - 2014: $75,000+ • PROJECTED 10/15 YEAR COSTS: • 10 YEAR: ~$1,155,000 (LOAN & ROUTINE MAINTENANCE) • 15 YEAR: ~$2,200,000 (LOAN & ROUTINE MAINTENANCE) • PROS • BUYS TIME TO DEVELOP FINANCIAL PLAN AND BUDGET • ALL NEW ROADS AT ONCE • DOES NOT REQUIRE FINANCING • CONS • NOT ASTHETICALLY PLEASING • SOME ROADS MAY REMAIN IN POOR CONDITION FOR LONG PERIODS • NO NEW COMPLETE ROADS FOR AT LEAST 5 YEARS

  10. AUDUBON ROAD PRIORITIES PRIORITY AREAS • EAGLE PASS (BETWEEN AUDUBON PKWY & VALLEY)

  11. AUDUBON ROAD PRIORITIES PRIORITY AREAS • THRUSH AND DOVE

  12. AUDUBON ROAD PRIORITIES PRIORITY AREAS • EAGLE PASS & SORA

  13. AUDUBON ROAD PRIORITIES PRIORITY AREAS • WEST AND EAST FALCON, AND WEST VALLEY

  14. AUDUBON ROAD PRIORITIES PRIORITY AREAS • EAGLE PASS & HESS LANE

  15. AUDUBON ROAD PRIORITIES PRIORITY AREAS • EAST AUDUBON (picture of Widgeon & Audubon)