20 likes | 33 Views
Production is commencing at 3 million tonnes per annum of Avima's H1 65% Fe Direct Shipping Ore (DSO). A pit optimisation was completed to produce a mine pit shell for Avima Centre. Avima's H1 is a product grade of 65% Fe with acceptable grades for SiO2, Al2O3 and P. http://www.avimairon.com/mining.html
E N D
Mining Production is commencing at 3 million tonnes per annum of Avima's H1 65% Fe Direct Shipping Ore (DSO). A pit optimisation was completed to produce a mine pit shell for Avima Centre. Avima's H1 is a product grade of 65% Fe with acceptable grades for SiO2, Al2O3 and P. Any lower grade DSO, Haematite BIF or Magnetite BIF within this initial pit will be stockpiled for processing or blending in the future. An expansion pit targets the higher grade Haematite BIF (H-BIF) and includes any remaining lower grade DSO. Production Rates