LBT Q4 2008 Engineering/Software Review

LBT Q4 2008 Engineering/Software Review. TERC Tertiary Mirror Units Commissioning. Project Summary. Polish mirrors  Coat mirrors  Attach loadspreaders  Integrate M3 units  Coordinate s/w dev  Acceptance test units Install on telescope. Highlights (Q1/2009).

airell
Download Presentation

LBT Q4 2008 Engineering/Software Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LBT Q4 2008 Engineering/Software Review TERC Tertiary Mirror Units Commissioning

  2. Project Summary • Polish mirrors  • Coat mirrors  • Attach loadspreaders  • Integrate M3 units  • Coordinate s/w dev  • Acceptance test units • Install on telescope LBT Q1 2009 Engineering Review

  3. Highlights (Q1/2009) • SX unit amplifier faults • Identified the situation leading to faults • Developed basic workaround • Installed remote power switch • Ability to monitor amplifier remotely • DX unit repair and installation • DX unit repaired • Installation scheduled (Q2) LBT Q1 2009 Engineering Review

  4. Open Issues • Technical • Mirror safety devices pending • Apparent amplifier firmware problems • UMAC must be turned on many seconds (~30) before servo units • Failure to do this puts the amplifier in a state that will lead to a fault when enabled • This does NOT seem to be remotely resettable • Revisions to amplifier firmware may correct LBT Q1 2009 Engineering Review

  5. Open Issues • Schedule • Commissioning constrained by observing • Financial • None/minor • Resource • None, except that there is only 1 telescope LBT Q1 2009 Engineering Review

  6. Progress (Q1/2009) • Debug and fix DX unit  • Perform reliability tests on SX unit  • Install DX cables on telescope (Q2) • Mount DX unit on telescope (Q2) • Complete Commissioning/acceptance tests on both units (Q2+) • Design and build mirror safety devices? (Q2+) LBT Q1 2009 Engineering Review

  7. Planning (Q2/2009) • Install DX cables on telescope • Mount DX unit on telescope • Study amplifier problem (plan long term fix) • Complete Commissioning/acceptance tests on both units (Q2+) • Design and build mirror safety devices? (Q2+) LBT Q1 2009 Engineering Review