70 likes | 240 Views
LBT Q4 2008 Engineering/Software Review. TERC Tertiary Mirror Units Commissioning. Project Summary. Polish mirrors Coat mirrors Attach loadspreaders Integrate M3 units Coordinate s/w dev Acceptance test units Install on telescope. Highlights (Q1/2009).
E N D
LBT Q4 2008 Engineering/Software Review TERC Tertiary Mirror Units Commissioning
Project Summary • Polish mirrors • Coat mirrors • Attach loadspreaders • Integrate M3 units • Coordinate s/w dev • Acceptance test units • Install on telescope LBT Q1 2009 Engineering Review
Highlights (Q1/2009) • SX unit amplifier faults • Identified the situation leading to faults • Developed basic workaround • Installed remote power switch • Ability to monitor amplifier remotely • DX unit repair and installation • DX unit repaired • Installation scheduled (Q2) LBT Q1 2009 Engineering Review
Open Issues • Technical • Mirror safety devices pending • Apparent amplifier firmware problems • UMAC must be turned on many seconds (~30) before servo units • Failure to do this puts the amplifier in a state that will lead to a fault when enabled • This does NOT seem to be remotely resettable • Revisions to amplifier firmware may correct LBT Q1 2009 Engineering Review
Open Issues • Schedule • Commissioning constrained by observing • Financial • None/minor • Resource • None, except that there is only 1 telescope LBT Q1 2009 Engineering Review
Progress (Q1/2009) • Debug and fix DX unit • Perform reliability tests on SX unit • Install DX cables on telescope (Q2) • Mount DX unit on telescope (Q2) • Complete Commissioning/acceptance tests on both units (Q2+) • Design and build mirror safety devices? (Q2+) LBT Q1 2009 Engineering Review
Planning (Q2/2009) • Install DX cables on telescope • Mount DX unit on telescope • Study amplifier problem (plan long term fix) • Complete Commissioning/acceptance tests on both units (Q2+) • Design and build mirror safety devices? (Q2+) LBT Q1 2009 Engineering Review