1 / 14

Energy Solutions

VRF Energy Modeling Savings Estimates Regional Technical Forum Variable Capacity Heat Pump Sub-Committee Meeting August 31, 2011. Energy Solutions. Outline. Requested Analysis Modeling Parameters Assumptions Results. 2. 2. Requested Analysis.

aizza
Download Presentation

Energy Solutions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VRF Energy Modeling Savings EstimatesRegional Technical Forum Variable CapacityHeat Pump Sub-Committee MeetingAugust 31, 2011 Energy Solutions

  2. Outline • Requested Analysis • Modeling Parameters • Assumptions • Results 2 2

  3. Requested Analysis • Model VRF energy savings for buildings in Seattle and Spokane using EnergyPro 5 • Based on SCE analysis • Mitsubishi VRF heat pump and heat recovery systems • Small office • 7,200 sf • Medium office • 41,500 sf 3 3

  4. Baseline Systems • Small office • Packaged rooftop air conditioner with gas furnace and constant volume fan • ASHRAE system type 3 • 4 units, 6-8 tons each, fixed temp economizer, 1080 cfm of OSA • Modeling software included conductive duct losses for electric cooling • Fan energy increased to compensate for duct leakage • Packaged rooftop heat pump and constant volume fan • ASHRAE system type 4 • 4 units, 6-8 tons each, fixed temp economizer, 1080 cfm of OSA • Modeling software included conductive duct losses for both electric cooling and heating • Fan energy increased to compensate for duct leakage 4 4

  5. Baseline Systems • Medium office • Packaged rooftop VAV with gas boiler reheat • ASHRAE system type 5 • 6 units, 19-26 tons each, fixed temp economizer, 6015 cfm of OSA • Increased electric cooling energy to compensate for conductive duct losses • Fan energy increased to compensate for duct leakage • Packaged rooftop VAV with electric resistance reheat • ASHRAE system type 6 • 6 units, 19-26 tons each, fixed temp economizer, 6015 cfm of OSA • Increased electric cooling energy to compensate for conductive duct losses • Fan energy increased to compensate for duct leakage 5 5

  6. VRF Systems • Small office • VRF heat pump system with DOAS • 2 units, 10 to 12 tons each, no economizer, 1080 cfm of OSA • VRF heat recovery system with DOAS • 2 units, 10 to 12 tons each, no economizer, 1080 cfm of OSA • Medium office • VRF heat pump system with DOAS • 6 units, 12 to 16 tons each, no economizer, 6015 cfm of OSA • VRF heat recovery system with DOAS • 6 units, 12 to 16 tons each, no economizer, 6015 cfm of OSA • No duct conductive losses or leakage 6 6

  7. Modeling Parameters • ASHRAE 90.1 - 2007 Baseline • Small office – Packaged RTU w/ gas heat or heat pump • Separate baseline models created using 90.1 parameters • Base case had 4 total zones and 4 rooftop units • VRFs were modeled with 8 zones and 2 outdoor units • Baseline equipment was modeled on typical sizes, VRFs were based on actual Mitsubishi equipment in EnergyPro • Medium office – VAV w/ boiler or electric reheat • Used standard VAV energy models auto-generated by EnergyPro for the VRF simulation baselines • Program assigned the same number of VAV air handlers as VRF outdoor units – 6 total; more AHUs than normal for capacity • Baseline VAV capacities were sized by EnergyPro to satisfy peak block loads for assigned zones; capacities did not fall into typical VAV size categories 7 7

  8. Modeling Parameters • Energy savings • Baseline energy use: cooling, electric heating, fans, and pumps • VRF and DOAS system energy use: cooling, heating, fans, and branch selector boxes • Peak demand analysis • Evaluated summer and winter, comparing total building peak demand between measure and base 8 8

  9. Assumptions • 28% increase in electric heating and cooling energy to account for duct losses1 • Not included for VAV electric reheat • 37% increase in fan energy due to air leakage from ducts2 • Fisk, William J, et al., Duct systems in large commercial buildings: physical characterization, air leakage, and heat conduction gains, LBNL-42339, page 110, November 1999 • Diamond, Rick, et al., Thermal Distribution Systems in Commercial Buildings, LBNL-51860, page 12, May2003 9 9

  10. Energy Usage – Small Office 10 10

  11. Energy Usage – Medium Office 11 11

  12. Results – Small Office 12 12

  13. Results – Medium Office 13 13

  14. Savings Summary 14 14

More Related