1 / 4

Just a bit on Wasson Ch 50 – Reliability, Availability, Maintainability

Just a bit on Wasson Ch 50 – Reliability, Availability, Maintainability. Steve Chenoweth EMGT 587. Or, It’s doomsday, did you have any plans?. Some key concepts Wasson has…. Compensating provision – what were those plans, just in case? Delay time – The wait while nothing is getting fixed.

akamu
Download Presentation

Just a bit on Wasson Ch 50 – Reliability, Availability, Maintainability

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Just a bit on Wasson Ch 50 – Reliability, Availability, Maintainability Steve Chenoweth EMGT 587 Or, It’s doomsday, did you have any plans?

  2. Some key concepts Wasson has… • Compensating provision – what were those plans, just in case? • Delay time – The wait while nothing is getting fixed. • End effect – The consequence of a failure mode,at the highest level. • Latent defects – Everything in software? Right - Famous cartoon by Jack Davis (b. 1926) “Go ahead and putt, it'll be a few minutes before the shock wave reaches us.”

  3. A little intro on Reliability…

  4. To be continued next time… • We’ll get to the ways to manage design for Reliability, Availability, and Maintainability. • For now, you should know the “Bathtub Curve” – It’s on the homework:

More Related