1 / 13

Rain Gage

Wireless Communication. 2102. Rain Gage. 40 Watt Solar Panel. Treated Flow. 2150. 948 Battery. 948 Battery. Total Flow. 2150. 2191. Battery. 6712 Sampler Influent. 6712 Sampler Effluent. 2100 Bottom port Y-cable p/n 60-5314-603. 2100 Sampler interface cable 100 feet.

akina
Download Presentation

Rain Gage

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wireless Communication 2102 Rain Gage 40 Watt Solar Panel Treated Flow 2150 948 Battery 948 Battery Total Flow 2150 2191 Battery 6712 Sampler Influent 6712 Sampler Effluent 2100 Bottom port Y-cable p/n 60-5314-603 2100 Sampler interface cable 100 feet 2100 Sampler interface cable 10 feet A/V Sensors 3/8” Strainer 24” Spring Ring w/scissor BYPASS FLOW Hancor SWQU 3/8” Strainer Sump 15” 15” 15” Spring Ring w/scissor Module Extension Cable (up to 3300 ft) Sensor Extension Cable (50 ft max) Sampler Interface Cable SMNW Hancor INF/EFF($40,000 budget)

  2. 2102 Wireless Communication 948 Battery 40 Watt Solar Panel Ultrasonic Level Sensor 2110 A/V Flow Meter 2150 2191 Battery 6712 Sampler Influent A/V Sensor EDDB Outlet Structure 36” Spring Ring w/scissor Submersible Pressure Transducer Solnist Level logger Gold SMNW Dry Detention EFF($40,000 budget)

  3. FLOW OP Youth Soccer (no budget for equipment)

  4. OP PH – Recycling Center ($20,000 Budget)

  5. Oregon Trail Park 1 ($23,000 budget)

  6. Oregon Trail Park 2 ($23,000 budget)

  7. Shawnee Justice Center 1 ($48,000 budget)

  8. Shawnee Justice Center 2 ($48,000 budget)

  9. Shawnee Justice Center 3 ($48,000 budget)

  10. Lenexa Fire Station 1 ($14,967 budget)

  11. Lenexa Fire Station 2 ($14,967 budget)

  12. Willow Lake ($25,200 budget)

More Related