260 likes | 364 Views
WP 16 Central Information System MyOcean2 First Annual Meeting – Cork /16-17 April 2013. Work Package Main Objectives. MyOcean Information System (MIS). Work package objectives: Develop MyOcean CIS Operate MyOcean CIS
E N D
WP 16Central Information System MyOcean2 First Annual Meeting – Cork /16-17 April 2013
Work Package Main Objectives MyOcean Information System (MIS) • Work package objectives: • Develop MyOcean CIS • Operate MyOcean CIS • Participate to transition from one release to next one, with service continuity • Develop and/or advocate some non central components (for distributed DUs) CIS User Interface System (UIS) MFC TAC Users
CIS Sub-system MyOcean Information System (MIS) • CIS sub-system: One of the 67 MyOcean sub-systems (42 PUs + 24 DUs + 1 CIS) • Project information and communication • Provides to MyOcean Users a common catalogue to access product Discovering, Viewing, Downloading and information about product s (Quality, User manual, …) • Provides interfaces and support to Producers to describe products and services in the MyOcean catalogue • Provides means to manage MyOcean Users • Monitors the products, the sub-systems and users. And provides Monitoring dashboards and reports User Interface System (UIS) Product Managers Users Service Desk, Service Managers
MyOcean Gateways • MyOcean Gateway (because dissemination function is geographically distributed ) • Provides View functionalities • both for • Provides Download functionalities • Gridded products • In Situ products • Along track products CIS PC PUs MIS DUs View Download Users
Partnership Central Information System WP16 Operation & Service Lead WP16.1 CLS Operations WP16.2 Service WP16.3 Science& Technology WP16.4 R&D WP16.5 Implementation & TransitioningWP16.6 CLS CLS Ifremer Ifremer CLS Ifremer Ifremer U-Read U-Read Altamira CLS CLS Ifremer URead
V3 Challenges identified at Kick off • Neither easy nor good for relationship • CIS design in parallel of Top-level design • Incremental & parallelisation of CIS implementation • Establish stronger links with technical Community (Unidata, ...) (not enough) • V2 operational maintenance • And V3 implementation At same time ! • And V4 design • Change Web-portal host (without outage) .... Let’s see on Tuesday
V3 Achievements (1/16)Search • Re-designed search page • with additional criteria/menus • + Keyword search
V3 achievements (2/16)Search results • Search results page improvements • Search refinement on search result page • Keyword highlighted after keyword search
V3 Achievements (4/16)Viewing / product description Access to Product description from the Viewing interface
V3 Achievements (5/16)Viewing / All datasets Dataset selection within the Product Spec
V3 Achievements (6/16)Viewing / Transect Transectdiagram plots
V3 Achievements (7/16)Viewing / Time series plots Time series plots
V3 Achievements (8/16)Polar stereographic projection North and South polar stereographic projection
V3 Achievements (9/16)Viewing OpacitySelection Overlay showing a latitude-longitude graticule
V3 Achievements (10/16)MyOcean FTP Classic FTP with user login/password => Transaction Accounting
V3 Achievements (11/16)Transaction accounting Reports Logs on DUs + Web-portal Transformation Cross analysis Statistic Reports Dashboards
V3 Achievements (13/16) Product description CIS – Central Information System
V3 Achievements (14/16)Processing Information • Product Availability • Product Timeliness
V3 achievements (15/16) Upstream product editing
Upstreamproducts V3 Achievements (16/16) Link with Upstream products Describe link between MyOcean Products and Upstream products
V3 AchievementsSynthesis • Web-Portal • Search and Product page improvements (1ststep) • Access to products • Subsetting of NETCDF-4 files (input) • FTP with central authentication and Transaction Accounting • View of In Situ products (Océanotron) • Viewing of all datasets • View : Transaction accounting • Information System • User administration improvement • First steps to facilitate product and access-service changes (Geonetwork) • Product dependency Dashboard • Collaboration with SeaDataNet • User administration (same login/password), Gateway, Vocabularies, .. V3.x • Operation & Service Management • Redundancy of all CIS components….. Partially, V4 V3.x V3.x V3.x
V4 Main objectives (1/2)User interfaces • Search and product pages (2nd step) • Dynamic information for Users: Timeliness and Availability • Better integration of Search, View and Download interfaces • Single GUI for all download • Sub-setting and View of In Situ Products • Sub-setting and View of Along Track products • NETCDF-4 compatibility (view and download)
V4 Main objectives (2/2) • Information System • Improvement of catalogue management (2ndstep) • Better management of static and dynamic information • More and advanced monitoring dashboard and reports • Better product dependency Dashboard • Collaboration with SeaDataNet • User administration (same login/password), • Gateway, • Vocabularies • Operation & Service Management • Full redundancy of CIS components