LavsIssues • Lav 12 status. • Installation of LAV9. • Tube 26-28 status • Conclusions.
Lav 12 status. • Drawings are almost ready. • Panel light tight must be finalized. • Orders for top part and lower carriage has been placed. • Next step is to interact with production company to finalized drawings for construction. • The delivery time is two month after the approval of final drawing for construction.
Survey holes DETAIL FROM G.DRAWING: - LAV 12 SCHEME Verification of the access to the survey holes to be able adjusting the Lav 12 During an external survey we can traslate it outside.
Aluminum sheet panels Panel light tight Inner Cylinder
LAV 12 GENERAL DRAWING WITH MAIN REFERENCES EDMS: 1320184 v.1 Survey holesR=3200
Installation of LAV9. • Installation issues. • Survey position validation.
Installation issues The only reference available during the installation was tube 24 that was not round. We reference to it try to center Lav 9.
Survey position validation The lav 9 has been surveyed with the following results:
Survey position validation The precision is such that it is difficult to believed it.
Tube 26-28 status • A preliminary revision of drawings with the company has been done verifying feet positions and dimensions. • The deliver schedule has been update. • The deliver of tube 26-28 at CERN is envisaged in the middle of March 2014.
Conclusions • We can consider to receive the lav 12 in Frascati at the end of March 2014. • The Tube 26-28 can be delivered at CERN Middle of March. • After the middle of March we can installed the rest of LAVS. • Integration and organization of the transportation LAV12 can take place in the following three months.