FETS & Design study summary by Jürgen Pozimski PASI OsC meeting 13 th July 2012

FETS & Design study summary by Jürgen Pozimski PASI OsC meeting 13 th July 2012. FETS - Status. Ion source Plasma investigations show first results, further progress to achieve all FETS goals simultaneously within the next two years expected. LEBT

alaire
Download Presentation

FETS & Design study summary by Jürgen Pozimski PASI OsC meeting 13 th July 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FETS & Design study summary by JürgenPozimski PASI OsC meeting 13thJuly 2012

  2. FETS - Status • Ion source • Plasma investigations show first results, further progress to achieve all FETS goals simultaneously within the next two years expected. • LEBT • Alignment problem persits, little experimental time in the last 3 month. • RFQ • No further delays since manufacturing started • Testing of structure prepared, High power setup ready for commissioning mid 2013. • MEBT • Engineering effort started, Lattice under review. • Diagnostics • Conventional diagnostics in good shape, • Laser diagnostics benefits from RHUL contribution.

  3. NF design - Status • IDS - NF • Swift adoption of baseline to consequences of Daya Bay results. Delivery of RDR on track. • EUROnu • Delivery of final report scheduled for September, input for CERN strategy and PRST-AB articles in preparation, first costing (12.5 GeV). • UKNF • Harwell site as alternative to CERN in EUROnu report. • High impact on FE design. • Championing LENF with final acceleration using FFAG. • Leading Decay ring effort. • Leading costing effort. • High impact from ASTeC engineering.

  4. FETS – plans overview

  5. RFQ - plans

  6. MEBT - plans

  7. Funding - staff • All requested (named) staff – universities and STFC funded. • RHUL, UCL, Huddersfield staff joint collaoration. • ~ £ 100.000 of allocated funding p.a. will contribute to additional staff requested (engineering & technician). • Contract for 6 month engineering support by Alberto (Spain) signed.

  8. Funding - equipment • Annual funding of ~ £ 510.000 allows for equiptment spending of ~ £ 400.000 incl. VAT p.a. Final RFQ payment is not included, possible savings in MEBT under investigation. To early for further details.