10 likes | 104 Views
Table of Contents. Section 1: SOL & IROL Related Definitions Section 2 : Background – North Florida Event – Mitigation Plan Section 3: NERC Standards related to SOLs and IROLs Section 4 : New or Revised FRCC Procedures
E N D
Table of Contents • Section 1: SOL & IROL Related Definitions • Section 2: Background – North Florida Event – Mitigation Plan • Section 3: NERC Standards related to SOLs and IROLs • Section 4: New or Revised FRCC Procedures • Section 5: TOPs are responsible for SOLs & will provide pre-identified List • Section 6: The RC is Responsible for IROLs (currently only 2) • Section 7: TOP options to send LTE/times and STE/times • Section 8: Examples of Potential & Actual IROL Exceedances • Section 9: Examples of Potential & Actual SOL Exceedances • Section 10: Examples of Potential & Actual Facility Rating (FR) Exceedances