An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. From a leased capacity to a dark fiber BELNET network Lessons learned TF-MSP Meeting 9 November 2010 Dirk Haex

  2. Agenda • BELNET before and after 2008 • BELNET & Dark Fiber: lessons learned • … concerning fiber providers • … concerning housing locations • … concerning threats/risks • … concerning operations • … concerning IRU contracts and legal aspects • BELNET & Dark Fiber: our advice

  3. BELNET before 2008

  4. BELNET after 2008

  5. BELNET & Dark Fiber Lessons learned • … concerning fiber providers • Fast fiber degradation • Attenuation and margin in the ring(s) • Fiberproviders and subcontracting • Number of fiber providers • Advantages / disadvantages

  6. BELNET & Dark Fiber Lessons learned • … concerning housing locations • BELNET PoPs: more facilities needed • Power + no-break • Space • Cooling • 24/7 Access • “Professional” datacenters • What’s in a name…

  7. BELNET & Dark Fiber Lessons learned • … concerning threats/risks • Take over of fiber provider during IRU… • Large fiber rings and fiber cuts • Profound analyse of fiber routes • Redundancy is key! • Double fiber entrance (PoP’s) • The future of “fiber as a service”?

  8. BELNET & Dark Fiber Lessons learned • … concerning Engineering & Operations • Extension of the fiber network • within the ring • Cross Border Fibers • Documentation is key! • Scheduled maintenance • Analyse impact • Fiber and optical expertise within NREN

  9. BELNET & Dark Fiber Lessons learned • … concerning IRU contracts and legal aspects • Fiber specifications, SLA • Penalties • IRU template • Experience with upfront payment and service

  10. BELNET & Dark Fiber Our advice • … if we should rebuild the fiber network • 2 fiberpairs per ring • Detailed fiber maps at street level • all using the same dataformat • Fiber specifications clearly defined and penalties included • Internal cabling: Include ODF losses in end to end fiber attenuation

  11. BELNET & Dark Fiber Our advice • … if we should rebuild the fiber network • as little providers as possible • 1 connector type – APC

  12. BELNET & Dark Fiber To conclude • … a fiber network gives you: • … flexibility • … Unlimited “bandwidth” • … fast upgrades (extra wavelengths) • …. More services • …