60 likes | 462 Views
LG&E - Cane Run Station. Capacity: 610 MW 3 Units Burn: 1.5 MM TPY Receipts By: Rail and Barge ( via Riverport ) Quality: Moisture 12% Ash 12% SO2 6.2 BTU/# 11,000 . LG&E – Trimble County Station. Capacity: 547 MW 1 Units Burn:
E N D
LG&E - Cane Run Station • Capacity: 610 MW 3 Units • Burn: 1.5 MM TPY • Receipts By: Rail and Barge (via Riverport) • Quality: Moisture 12% Ash 12% SO2 6.2 BTU/# 11,000
LG&E – Trimble County Station • Capacity: 547 MW 1 Units • Burn: 1.6 MM TPY • Receipts By: Barge • Quality: Moisture 15% Ash 14% SO2 6.5 BTU/# 11,000
LG&E – Mill Creek Station • Capacity: 1,610 MW 4 Units • Burn: 4.4 MM TPY • Receipts By: Rail and Barge • Quality: Moisture 13% Ash 14% SO2 6.2 BTU/# 11,000
KU – Brown Station • Capacity: 755 MW 3 Units • Burn: 1.6 MM TPY • Receipts By: Rail • Quality: Moisture 10% Ash 12% SO2 2.75 BTU/# 12,000 Scrubber Units Scheduled To Be Online: All Units- Spring 2009
KU – Ghent Station • Capacity:2,189 MW 4 Units • Burn: 1.4 MM TPY High Sulfur 3.9 MM TPY Compliance • Receipts By: Barge • Quality: Unit #1 Unit #2,3,4 Moisture 10% 10% Ash 12% 12% SO2 6.25 1.2 BTU/# 11,000 12,000 Scrubber Units Scheduled To Be Online: Unit 2- Spring 2007 Unit 3- Spring 2008 Unit 4- Spring 2009
KU – Green River and Tyrone Stations Green River • Capacity: 175 MW 2 Units • Burn: .350 MM TPY High Sulfur • Receipts By: Truck • Quality: Moisture 12% Ash 12% SO2 4.57 BTU/# 11,500 Tyrone • Capacity: 75 MW 1 Units • Burn: .150 MM TPY High Sulfur • Receipts By: Truck • Quality: Moisture 8% Ash 10% SO2 1.8 BTU/# 12,000