30 likes | 54 Views
Why do companies use a predetermined overhead rate rather than actual manufacturing overhead costs to apply overhead to jobs?
E N D
PREDETERMINED OVERHEAD RATE / TUTORIALOUTLET DOT COM Predetermined overhead rate FOR MORE CLASSES VISIT www.tutorialoutlet.com Why do companies use a predetermined overhead rate rather than actual manufacturing overhead costs to apply overhead to jobs? Explain underapplied and overapplied overhead and tell about the adjustment that is made at the end of the period. What is a plantwide overhead rate? Why are multiple overhead rates, rather than plantwide rates used by some companies? What happens to overhead rates based on direct labor when automated equipment replaces direct labor? the book i am using for this class is Noreen, E., Brewer, P.C., & Garrison, R.H. (2017). Managerial Accounting: An Overview. In Managerial Accounting for Managers (4th ed., pp. 1-22). New York, NY: McGraw-Hill.
PREDETERMINED OVERHEAD RATE / TUTORIALOUTLET DOT COM This presentation uses a free template provided by FPPT.com www.free-power-point-templates.com