An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Intro Thomassen Compression Systems

  2. Running on new operational conditions with present make-up cylinder. Running on new operational conditions with present recycle cylinder. Extra make-up capacity (new compressor). Proposed by TCS / Porto / IFP. Requested by IFP (on behalf of Porto)

  3. E-MOTOR DESIGN ‘96 Design ‘96 1.550 Kw. (eff. 1.115 Kw.) (rel. 1.520 Kw.) Ø215 Make-up C3701 A/B Ø401 Recycle C 35 Ps: 32,20 Bara Ps: 42,90 Bara Pd: 47,30 Bara Pd: 64,90 Bara Ts: 58,00 ºC Ts: 53,00 ºC Td: 91,00 ºC Td: 94,00 ºC Mol: 6,56 Mol: 2,92 Flow: ± 10.534 Nm3/h. Flow: ± 54.482 Nm3/h. Rod load: 122 Kn. (relief) Rod load: 498 Kn. (relief) Rating: 500 Kn. Rating: 500 Kn.

  4. E-MOTOR DESIGN ‘99 Design ‘99 Fig. 2 1.550 Kw. (eff. 1.085 Kw.) (rel. 1.450 Kw.) Requested by IFP (Fig. 2) Ø215 Make-up C3701 A/B Ø401 Recycle C 35 Ps: 30,60 Bara Ps: 47,37 Bara Pd: 47,37 Bara Pd: 67,56 Bara Ts: 32,00 ºC Ts: 52,00 ºC Td: 77,00 ºC Td: 90,00 ºC Mol: 2,08 Mol: 2,67 Flow: ± 10.565 Nm3/h. Flow: ± 60.262 Nm3/h. Rod load: 169 Kn. (relief) Rod load: 472 Kn. (relief) Rating: 500 Kn. Rating: 500 Kn.

  5. E-MOTOR DESIGN ‘99 Design ‘99 Fig. 1 1.550 Kw. (eff. 1.085 Kw.) (rel. 1.450 Kw.) Requested by IFP (Fig. 1) Ø215 Make-up C3701 A/B C3751 Ø401 Recycle C 35 Ps: 30,60 Bara Pd: 67,56 Bara Ts: 32,00 ºC Mol: 2,08 Flow: ± 2.915 Nm3/h. (27% extra)

  6. E-MOTOR Alternative ‘99 Alternative TCS ± 1.800 Kw. Suggestion by TCS ? Ø250 Make-up C3701 A/B Ø401 Recycle New C 35 Ps: 30,60 Bara Pd: 67,56 Bara Ts: 32,00 ºC Mol: 2,08 Flow: ± 14.049 Nm3/h. (127%) Rod load: 232 Kn. (relief) Rating: 500 Kn.

  7. E-MOTOR Alternative ‘99 Alternative Advantages ± 1.800 Kw. Suggestion by TCS ? Ø250 Make-up C3701 A/B Ø401 Recycle New C 35 • Advantages • No third machine required as the existing up-rated compressors can handle 127% each. • Investment for a 3rd reciprocating compressor is not absolutely required. • No extra cost for concrete structure, instrumentation & piping. • No additional space on existing platform has to be introduced.