1 / 12

Edison Welding Institute Innovative Manufacturing Technology

June 7, 2012. Edison Welding Institute Innovative Manufacturing Technology. EWI – Quick Snapshot. Founded to develop and deploy new materials, joining, and inspection technology Located in Columbus, Ohio in a 132,000 square foot facility >$20 million in capital equipment

albina
Download Presentation

Edison Welding Institute Innovative Manufacturing Technology

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. June 7, 2012 Edison Welding InstituteInnovative Manufacturing Technology

  2. EWI – Quick Snapshot • Founded to develop and deploy new materials, joining, and inspection technology • Located in Columbus, Ohio in a 132,000 square foot facility • >$20 million in capital equipment • Mix of industry and government clients • Not-for-profit, 501(c)(3) organization with revenue ~$25 million and over 130 employees • 247 Members spread across more than 3000 global locations Fundamental Research Technology Development TechnologyApplication Member Companies Universities & National Labs

  3. EWI – Centers and Consortia Maximizing technology implementation through industrial collaboration and public/private partnerships

  4. Laser Decontamination

  5. EWI Laser Decontamination Technology • Smallest, lightest, highest powered scanner • Highest efficiency and paint stripping rates • Best recorded effluent removal of any available system • Integrated process control • Able to remove all colors (tested to date) • System works with multiple laser platforms • CO2 Laser, Nd YAG, Fiber • Travel speed • 40 to 80 inches per minute • Adjustable processing width

  6. Portsmouth D&D Challenges • Cleanup of DOE sites are technically challenging because of • Personnel hazards • Large size of facilities • Complex, crowded and often retrofitted arrangement of equipment and structures • Poorly understood and difficult-to-characterize contaminants • Lack of decisions on facility end states • Facility D&D comments from multiple DOE reports • D&D work relies on manual labor for building characterization • Removing contamination from building walls, other surfaces and equipment can be slow and ineffective • Personal protective equipment tends to be heavy, hot and limits movement of workers

  7. Increased Recycling Opportunity • Two categories for Portsmouth/Piketon metals • Must bury • Recycle A. For use in nuclear industry B. For use in any industry • EWI technology could reduce item 1 while significantly increasing the quantity and quality of materials for items 2A and 2B. • Mix of Technology • Laser Decontamination Surface Contaminants (>100M lbs) • Chemical Vapor Refining Through Thickness Ni (>10M lbs) • Steel Mill All scrap metal forms

  8. Technical Applicability to Portsmouth D&D Effort • EWI’s Laser Decontamination system has the ability to; • Remove all contaminates encapsulated in the painted surfaces of structural concrete, steel and composites on the site • Reducing total tonnage slated for burial • Improved environmental protection by decontaminating while still under roof • All contaminants contained in combustion product • Smaller quantity (unfortunately with higher localized contamination) • No secondary waste streams generated -- no blast media or chemicals • Unknown variable • Radiologically contaminated materials

  9. Sustainable Business Opportunity • Personnel and environmental safety are top priority during D&D activities • ~3000 DOE sites in the U.S. planned for closure and D&D in the future • Unknown quantity of similar sites internationally • DOE sites alone could create decades of sustainable jobs and business growth

  10. Potential Partnerships • Wastren/Hadsell Development • Laser Decontamination • Potential Funding Sources • Recycling Revenue • State of Ohio • Federal government • Private Investment • Labor Unions • Steel Mills and Fabricators • Other Corporate Partners

  11. Questions

More Related