1 / 46

Going with the flow

The Journey to Continuous Improvement. Going with the flow. Synchronous Flow. Harvard Business Review. “Medical treatment has made astonishing advances over the years. But the packaging and delivery of the treatment are often inefficient, ineffective and customer unfriendly.” HBR, 2007

alden
Download Presentation

Going with the flow

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Journey to Continuous Improvement Going with the flow Synchronous Flow

  2. Harvard Business Review “Medical treatment has made astonishing advances over the years. But the packaging and delivery of the treatment are often inefficient, ineffective and customer unfriendly.” HBR, 2007 “Systems designed for manufacturing are fully applicable to health care.” HBR, 2005

  3. Today’s Objectives • What is Synchronous Flow? • How does it work with Lean Healthcare • Kaizen Blitz Events • Synchronous Flow Timeline

  4. Our mission is to excel at providing personalized, quality care; where people come first. • Our vision is to be the provider of choice by creating a professional environment where: • patients want to receive care • clinicians want to practice medicine • employees want to work

  5. We will accomplish this by: • empowering our caregivers with education, technology, and personal and professional development, • creating an environment which builds collaborative relationships among physicians, staff and patients, • providing our communities with the educational resources and support to enable individuals to make informed decisions and play an active role in managing their own health, • offering safe, personalized, high quality care.

  6. A Synchronized System:What does it take?

  7. Synchronous Management • A management approach that views resources in a system as elements of an interdependent network • all of which can be synchronized to a strategically selected control point • in such a way as to optimize the performance of the entire system. • Rooted in the concepts of Constraints Management.

  8. The Synchronous approach • A “Control Point” is selected, optimized and finitely scheduled at the desired Throughput amount • All other functions strive to serve the Control Point • Predetermined inventory “ Buffers” are strategically placed to protect the Control Point • Buffers are proactively managed daily • New Patient release is metered to control WIP and lead times.

  9. RM Buffer Time Drum, Buffer, Rope Rope Medical Service Demand Exit Gate CP Input Output Constraint Buffer Time Process Flow Processes from the Gate to the Exit are divided into zones and managed continuously

  10. Synchronous Flow Elements • Relentless efforts to reduce all waste that is of no value to the patient experience • More time dedicated to patient care • From about 40% to at least 70% • Work release – Input / Output model • Standard work practices • Productive capacity and Protective capacity • Buffer Management logbook for each process • Buffer Analysis systems for each process • Focus Meeting script.

  11. Process Failures • Errors – incorrect execution of a task when everything needed is available • Problems – Disruption of a worker’s ability to execute a prescribed task as planned • Clear, complete and timely information unavailable • Some tool or resource needed is unavailable • Something is present that is not necessary Synchronous Flow procedures differentiate and track each.

  12. Problem Solving • Level One Problem Solving • Worker compensates for the failure • The underlying cause is not addressed • Worker does not want to “make waves” • Can actually be counterproductive • Level Two Problem Solving • Worker addresses the immediate issue • Actions taken to identify and address the core causes • Willingness to “make waves” is encouraged by management • Organizational improvement occurs

  13. Improvement Requires Change Your existing system is designed to give you the results you’re currently getting. If you want different results, you must change the system!

  14. Implementing Change “Improvement occurs only with change.”

  15. The Opportunity for Change Change Knowledge What is it? Head Desire Why should I? Heart Skill How do I? Hands

  16. The Synchronous Flow Focusing Steps Three necessary conditions • Definethe system • State the purpose • Decide how tomeasureit Five Focusing Steps • Identifythe system’s Control Point (s) (Constraints) • Decide how toexploitthe system’s Constraints (s) • Subordinateeverything else to the above decisions • Elevatethe system’s constraint • When a constraint is broken,returnto step one. Do not allowinertiato become the system’sconstraint.

  17. A Constraint is... Anything that limits an organization’s higher performance relative to its goals • Can be internal or external • Can be a process, a policy or a paradigm. The Control Point is… • The location within the scope of the system on which we choose to focus • The point upon which operational measures are based.

  18. A Bottleneck is... • A temporary limitation caused by Murphy • The effect is an intolerable situation • Something that we want to defeat • Something we respond to with urgency • Prioritized according to the relative threat to the Control Point.

  19. ProductiveCapacity • The capacity required to meet the overall demand • Largely determined by the constraint of the system • This is the Drum of the process.

  20. ProtectiveCapacity • Additional capacity required on all resources to overcome... • Murphy (statistical fluctuations) • Resource contention • Establishes an unbalanced system • Generally available with existing resources.

  21. A Closer Look Constraints • The are anything that limits performance • They’re not necessarily bad things • Every system has at least one • They determine your system’s capacity • They are your system’s most valuable resources • Choosing to manage them is better than chasing Murphy • Focusing attention on them simplifies life.

  22. Buffer Management Purpose: to identify and record buffer problems and assign responsibility to fix them • Meetings are held at least once per day at a designated time and place for a maximum of 15 minutes • Everyone is on time and prepared • Actions items and person responsible for each is communicated • The essence of proactive management.

  23. Remember! • Common practices lead to balanced capacity • Balanced capacity systems are unstable and under-productive • Unbalanced capacity systems are stable, with increased velocity and predictability • Constraints hold the key to focusing improvement activities.

  24. What is Lean? • Delivering more Value with Less Investment • The Toyota Production System (Deming and Ohno) • Founded upon: • Customer focus • Respect for humanity • Prudent, systematic elimination of waste • Expected outcomes: • Improved customer satisfaction • Improved employee satisfaction • Improved organizational performance

  25. LeanManagement Defined a systematicapproach to identifying and eliminating waste through continuous improvement, by flowing the product at the pull of the customer, in pursuit of perfection.

  26. Synchronizing the Lean Tools • Kaizen Blitz Events - Continuous, incremental improvement of any activity to create more value with less waste • A focused, team approach toward breaking the status quo by making immediate changes • Applied continuously to exploit the selected control point. • Prioritized to establish the necessary protective capacity.

  27. Synchronizing the Lean Tools Value Stream Mapping - plotting all the activities necessary for a product family • Identifies non-value-added activities • Helps to identify the constraints and Control Point • Developed to “define the system and its purpose” • Used during “identify,” “exploit,” and “subordinate” to minimize waste and to prioritize Kaizen events.

  28. Synchronizing the Lean Tools 5 S’s - A safe, clean, neat, arrangement of the workplace. • Sort - eliminate the unnecessary • Straighten - a place for everything and everything in its place • Shine- Clean the workplace • Standardize - Rules to maintain • Systematize - Self discipline to sustain • Prioritized during the “exploit” and “subordinate” steps to organize the workplace.

  29. Synchronizing the Lean Tools Pull mentality - A system of operational behaviors from downstream to upstream activities • Schedule for the Control Point is determined from market demand • Release of Raw Materials is determined by consumption at the Control Point • All other activities are Synchronized to Control Point via Drum, Buffer, Rope.

  30. Characteristics of a Lean Enterprise • High value-added - little waste • Simplicity and visibility • Process standardization • Demand based flow • Culture • Empowered teams • Open communication • Enforced accountability • Continuous improvement mentality

  31. Lean Principles 1. Specify VALUE 2. Identify the VALUE STREAM 3. Make value-creating steps FLOW 4. Let patient flow PULL value 5. Pursue PERFECTION Lean Thinking, Womack & Jones

  32. Lean Strategies and Tactics • System mapping • Organize for flow • Total employee involvement • Pull systems • Quality systems • Institutionalized improvement • Standardized work • Five S's • Visual workplace • Set up / changeover reduction • Total productive maintenance • Design out waste • Measure the right things

  33. Value Added vs. Non-Value Added • Value added: An activity that directly serves the needs of the patient. • Non-value added: any other activity Value Stream • The specific series of activities required to provide a defined service for the customer

  34. The Seven Types Of Wastes 1. Excess material movement 2. Unnecessary process 3. Unnecessary motion 4. Defects 5. Inventory 6. Delays 7. Over production

  35. Elements of Work At least 30% of skilled nursing time is spent doing non-clinical activities. Work Work content Waste

  36. System Mapping • Flowchart of value stream activity • Understand the macro system • Identify material stream flow, obstacles to flow, control systems, inventory locations • Group knowledge, creativity

  37. Functional Spaghetti Diagram 2 2 1 1 3 3 1 1 3 3 4 4 4 5 5 5

  38. Kaizen Blitz Trained teams of people empowered to make immediate and tangible changes for improvement. The PCSAM model • Problem / opportunity identified • Core causes confirmed and documented • Solution and plan of action developed • Aggressive action applied to the solution in 3 to 5 days • Measurements tracked to assure success No going from problem to solution in this approach.

  39. The Kaizen Cycle Measure results Problem Identification Action Core cause of the issue Solution and plan -39

  40. Where to Begin • Identify the system – value stream mapping • Choose measures, set objectives • Decide how to exploit the system • Flow layout, constraint positioning, inventory strategy, cells • Pull system - synchronized flow • Kaizen - waste elimination • Set-up reduction • Standardization • Workplace improvement/visual control

  41. Conditions for Success • Senior management understanding • Visual and vocal leadership • Clear and elevating goals • Complimentary measurement system • Guiding Coalition – Steering Committee • Education and training • Make clear - “What’s in it for me”

  42. Implementation Timeline • Educational session for key staff • Selection and training of the Steering Committee • Identification of Kaizen opportunities • Selection and training of Kaizen Teams • Development of the Synchronous Flow Model • Constraint and Control Point identification • Buffer Management • Productive / Protective Capacity • Focus meeting process.

  43. Process Improvement • Communicate the basis of needed change to everyone in small group settings • Select a Steering Committee to manage the process • Select a key group of leaders to participate in the design and implementation of a new system for each identified target • PCSAM development • Kaizen Blitz to aggressively address each opportunity • Synchronize all activities to support a single selected control point • Make it visible for effective communication • Practice Buffer Management for effective accountability • Emphasize that continuous improvement means there is no finish line.

  44. And remember… When you’re through changing, you’re through. Thank You !

  45. Change Did you know that 75% of all change initiatives fail?

  46. The 8 Reasons for Failure • Complacency • Weak Leadership • Lack of vision • Lack of communication • Stopping at obstacles • Invisible progress • Declaring victory too soon • Neglecting to establish change in culture

More Related