130 likes | 319 Views
EUMETNET C-SRNWP Programme : status and plans. Gergely Bölöni C-SRNWP: Coordination on Short Range Numerical Weather Prediction. Introduction. Coordination on short range NWP between 32 European meteorological institutions
E N D
EUMETNET C-SRNWP Programme: status and plans Gergely Bölöni C-SRNWP: Coordination on Short Range Numerical Weather Prediction COSMO General Meeting 10-13 September2012
Introduction • Coordinationonshortrange NWP between 32 European meteorologicalinstitutions • OMSZ is theactualCoordinatingMember (tillthe end of 2012) Main activities: • Representshort-range NWP needsinfornt of otherinstitutions/projects (e.g. ECMWF or EUMETNET observationprogrammes) • Enhancecooperationon NWP: shareresourcesinoperations and stimulatecompetitiononscientificdevelopment COSMO General Meeting 10-13 September2012
Actual coordination activities 1) NWP requirementsregarding OPERA products • A relatedquestionnairewaspreparedby OPERA forNMSs 19 NMSsanswered • The main outcome is thatforSRNWP (assimilation) 3D volume (wind and reflectivity) dataarerequiredbyallNMSs (whicharereceivedatOdysseybutnotre-distributedatthemoment) with an appropriate QC flagging (rain, no-rain, cluttered, etc.) • Questionnaireoutcomestakeninto account whencomposingthe OPERA project requirementsforthenext EUMETNET phase (2013-2017) • ALADIN and HIRLAM providedproposalshowtospeedup and improvethevolumedatare-distribution (simpledata policy, nominatedtransmissioncentersineachconsortium, non-operationaldata service atthebeginning, recommendationthatNMSsincludewinddata and QC flagsasap, SRNWP prioritiesforthenext OPERA project) • Feedbackfrom OPERA: the NWP requirementswereuseful, recommendationsforincludingwinddata made by OPERA management through E-SAT (EUCOS ScientificAdvisory Team), SRNWP prioritiesnoticed COSMO General Meeting 10-13 September2012
Actual coordination activities • 2) ECMWF/IFS EPS LBCsto drive highresolution LAM EPS • To drive futurehighresolution LAM EPS systems extra IFS EPS runsareanticipatedbythe SRNWP communityfrom ECMWF onthe top of thepresentlyoperational (higherresolution, 06 and 18 UTC runs) • ECMWF developed an „economicarchive” tostore EPS modellevelfieldsonly over Europe, North-Atlantic, North-Africa (coveringallanticipated European EPS domains) • The „economicarchive” (reduced Gaussian grid) wassuccesfully tested byinterested European consortia (relevantmodels: ALADIN/ALARO, AROME, COSMO, HIRLAM) • Agreementreached (EPS-DA workshop Bologna 2011) withinthe SRNWP ET abouttheparameters (resolution, EPS size, forecastrange) of future test runs • IFS EPS testsarerequestedfromECMWF: 2x2 weeks T1279 test periodsareto be run (periodstobeagreedsoon) COSMO General Meeting 10-13 September2012
Actual coordination activities • 3) SRNWP surfacedatabase • (http://www.cosmo-model.org/srnwp/content/default.htm) • thanksto C. Heret and T. Andreadis • Data from Debrecen stationentered thedatabase • 5 newusers (Croatia, Germany, Hungary, Russia, Sweden) • 4) EWGLAM workshop (Helsinki, 8-11 October 2012) • http://en.ilmatieteenlaitos.fi/SRNWP2012/ (thanksto FMI, Carl Fortelius) • 65 participantsregistered • Check out theprogramme (almost finalized) • 5) High-resolution AMDAR profilesto be tested in SRNWP DA: • Highverticalresolutiondataprovidedby E-MADAR via GTS (17-18 May 2011) • BUFR test datasetprepared and distributedforthe SRNWP DA communityforprovidingreference (usualresolution) COSMO General Meeting 10-13 September2012
Actual coordination activities • Announcementsentto SRNWP DA communitytorunsimpleassimilationtestsbasedonthese 2 daystoseewhether monitoring statistics / analysisincrementsareaffected • 6) BUFR radiosonddata: • Collectinfoabouttheassimilation of BUFR (slanted) radiosondprofiles (takinginto account lat, lon, timeinformation) • Feedbackto E-SAT • 7) AMDAR humidityOSEs over US: • AMDAR humidityprofilesavailable over US • Nearfuture: EUCOS willinvite SRNWP DA institutionstoinvestigatetheimpact of the AMDAR humidityprofiles over US using European SRNWP models / DA systems (dedicatedbudget) COSMO General Meeting 10-13 September2012
Organizationalmatters (WARNING!) ExpertTeams • ExpertTeams (and theirchairs) are of keyimportancetocoordinatecross-consortiaissues! • Thereis no chair of theExpert Team forPhysicalParametrizations, Dynamics and System Aspects no candidateamong ET members candidates/proposalswelcome • FromJanuary 2013onwards no chair of theET forSurfaceAspects (Jean-Francois Mahfoufwillstep down fromhischairposition) • SRNWP AC should be renamedas SRNWP Expert Team (accordingtothenewrules of EUMETNET) proposal: composition and ToRremainsthesame, onlythename is to be changed COSMO General Meeting 10-13 September2012
Roadmap documents 2011-2012 Climate Programme Observation Programme Forecasting Programme Next EUMTENET phase: NWP relatedchanges 2008-2012 Assembly STAC PFAC Obs. + Clim. Programmes + EUMETCAL EMMAC-SRNWP SRNWP-I SRNWP-V COSMO General Meeting 10-13 September2012
Next EUMTENET phase: NWP relatedchanges 2013-2017 Assembly STAC PFAC Observation Programme Climate Programme Forecasting Programme EUMETCAL EMMA C-SRNWP EPS Nowcasting • Projects to be finished: SRNWP-I and SRNWP-V (end of 2012) • New anticipated projects: EPS, Nowcasting COSMO General Meeting 10-13 September2012
Next EUMTENET phase: NWP relatedchanges • Jan-March2012: project requirementswerecomposedthe 3 NWP relatedprojects: C-SRNWP, EPS, Nowcasting a less pessimisticpictureaboutfuture EUMETNET projectsthanatlast EWGLAM • End of March 2012: STAC/PFAC approvedtheForecastingProgrammerequirements and sentitforapprovalto Assembly (May 2012) thisimpliesthatthecontent of theC-SRNWP, EPS, Nowcastingprojectswerealsoapprovedby STAC/PFAC • Applicationsunderevaluationforallfutureprojects (including EPS, Nowcasting, C-SRNWP) proposalto STAC/PFAC till mid September 2012 • STAC/PFAC proposesprojects and CoordinatingMembersbasedontheevaluationreports(October 2012) COSMO General Meeting 10-13 September2012
Next EUMTENET phase: NWP related changes • Assembly decidesaboutthefutureprojects (November 2012) • Hand over existingprojects (January-June 2013) • Feelingsaboutthefuture(basedonfeedbacksfrom STAC/PFAC meetings): • The actual start of projectsrelatedtoforecasting/NWP (EPS, Nowcasting, C-SRNWP) willdependwhetherinterestedparticipatingmemberscanaffordthebudget (some of theimportantNMSsarenotinterestedintheseprojects) • the management structurewilldependonincomingbids COSMO General Meeting 10-13 September2012
Next EUMTENET phase: NWP related changes Content of the anticipated NWP related projects: • EPS project: 1.5 year feasibility project with the main goal of preparing a solid EPS project for the period of 2014-2017 (review and harmonize NMS scientific strategies for high-res EPS, identify overlaps in plans, prepare plans for reducing costs) • Nowcasting activity: 1.5 year feasibility „activity” with the main goal of recuiting Nowcasting experts (create an ET) who prepare a solid Nowcasting project for 2014-2017 (identify exchangable knowladge, organize timely observation exchange, etc.) • C-SRNWP project: 5 year project coordinating SRNWP like since 2008 COSMO General Meeting 10-13 September2012
How to improve C-SRNWP? My experience: • Scientific plans are driven at national or at conosrtia level (not at EUMETNET level) • C-SRNWP is NOT for driving plans How to use best this coordination programme? • Identify subjects that are in the interest of (more or less) all NWP centers (consortia) in Europe • Then these interests gain an official status, which we might use to put forward common plans. • These interests then can be more efficiently represented in front of other EUMETNET programmes and other organizations outside EUMETNET • …? Further questions: • Which interests more we have in common? • What do you all think about the above statements/questions? COSMO General Meeting 10-13 September2012