1 / 17

COORDINATION AND INTERFACES. FIELD CORRECTOR. CALIBRATION UNIT (ESO)

INSTRUMENTATION/ OID / L. Pasquini/ 1 ____________________________________________________________ FLAMES. COORDINATION AND INTERFACES. FIELD CORRECTOR. CALIBRATION UNIT (ESO) FIBRE POSITIONER (AAO and Mt. Stromlo)

aldona
Download Presentation

COORDINATION AND INTERFACES. FIELD CORRECTOR. CALIBRATION UNIT (ESO)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INSTRUMENTATION/ OID / L. Pasquini/ 1____________________________________________________________ FLAMES • COORDINATION AND INTERFACES. FIELD CORRECTOR. CALIBRATION UNIT(ESO) • FIBRE POSITIONER(AAO and Mt. Stromlo) • GIRAFFE: Fibres, Spectrograph Mechanics (Meudon) , Optics, Gratings, Control Electronics & SW, Detector, Integration, Testing (ESO) • DATA REDUCTION & ANALYSIS(Geneve-Lausanne) • FIBRE LINK TO UVES(ESO-Meudon-ITALConsortium) • SUPER-OS and OPERATIONS (ESO, ITAL Consortium)

  2. INSTRUMENTATION/ L. Pasquini/ 2____________________________________________________________ FLAMES Basic FLAMES Characteristics • FOV25 arcminutes diameter • Positioning fibres on one plate while observing with the otherplate • 8 objects to UVES - Red arm, R=45000, 1 simultaneous WLC Fibre for accurate RV • 132 Objects GIRAFFE Medusa1.2 arcseconds, R=15000 and R=7000 • 15 Objects GIRAFFE IFU 2.5x3.5’’, R=22000 and R=9000 • 1 GIRAFFE ARGUS, Integral Field7x11’’ (0.5’’ sampling; 4.2x6.6’’ with 0.3’’ sampling) R=22000 and R=9000 • Possibility of simultaneous GIRAFFE and UVES observations • Provision for additional spectrograph

  3. INSTRUMENTATION/L.Pasquini/3 ____________________________________________________________FLAMESPOSITIONER • Efficient Operations (positioning while obs., <10 sec/fibre, <5 min plate exch.) • Positioning accuracy (< 0.15 arcsec), and stability (< 0.05 arcsec/2 hours) • 4 FACBs (3X3 arcsec imaging bundles) for centering and secondary guiding • Small distance between buttons (<10 arcsec); 11 arcsec due to button size • Low fibre stress, bending, twisting (Fibre photometric stability) • Calibration unit for FF and Th-A (2 min/setup, accurate FF flux calibration) • Argus: 2 scales and ADC

  4. INSTRUMENTATION/ L. Pasquini___________________________________________________________ FLAMES CORRECTOR • OPTICS: BK7 Doublet • Transmission: Better than 85% in the 370-900 nm range (single layer MgF2 coating) • FoV: 25 arcminutes • Optical Quality: Better than 0.25 arcseconds (100% energy) over the whole FoV • Nasmyth Calibration Unit: To be used with Nasmyth Screen for additional calibrations (FF and fibre transmission) • Exit pupil: concentric to the field curvature • End of September 2001 commissioning at Paranal

  5. INSTRUMENTATION/ L. Pasquini____________________________________________________________ FLAMES FIBRES • 8 UVESfibres/plate; 1 arcsec, (+ 1 fibre for simultaneous calibration) • 132 MEDUSA (1.2 arcsec)/plate • 15 IFUs (+ 15 IFU sky)/plate (2x3 arcsec, 0.52” sampling) • 1 ARGUS (1 plate) +15Argus sky (7x11 arcsec with 0.52” sampling) • 5 Simultaneous Th-A spectra for EACH observation • Fibre photometric stability (< 2%) • Transmission exceeding specs

  6. INSTRUMENTATION/ L. Pasquini____________________________________________________________ FLAMES GIRAFFE • MEDUSA: separation 2.3 core (<0.3% contamination), sampling ~6 pixels • IFUs and ARGUS: separation 1.4 core (<20% contamination), sampling ~2.5 pixels • One 2x4K EEV detector (Bruce) • 18 cm beam, dioptric spectrograph • 2 gratings: (HR: 316 l/mm, 63.6 blaze; LR: 600 l/mm, 34 blaze) • Sorting Order Filters (Very Efficient)! • Stability: < 1 micron/hour • Repeatability: 0.3 pixels/day perpendicular to dispersion • Fixed setups (22 HR,8 LR) 370-950nm • Radial velocity specs: 1% resolution for V>17.5 G stars

  7. INSTRUMENTATION/ L. Pasquini____________________________________________________________ FLAMES Link to UVES RED ARM • HARDWARE modifications to UVES implemented. • 3 Standard UVES RED Setups (520, 580, 860 nm) • R ~ 45000 • Separation: 1.7 arcsec; contamination < 5 % • 8 Objects (eventually 1 to sky, no default sky fibre) • 7 Objects + 1 Simultaneous calibration (Accurate radial velocities) • 6 Objects (Overlap between orders at the blue edge, below 480 nm) • Efficiency: 50-60% of the UVES RED standard mode

  8. INSTRUMENTATION/ L. Pasquini____________________________________________________________ FLAMES FLAMES OBSERVING MODES • MEDUSA (GIRMED) • IFU (GIRIFU) • ARGUS (GIRARG) • UVES (UVES) • UVES Simultaneous (UVES_SIM) • Combined UVES + MEDUSA (COMMED) • Combined UVES + IFU (COMIFU) • Combined UVES + Argus (COMARG)

  9. INSTRUMENTATION/ L. Pasquini____________________________________________________________ FLAMES CALIBRATIONS • Calibrations should be taken in day-time to maximize observations • STANDARD Calibrations with Positioner: Fibre-Fibre transmission < 2%, Pixel-Pixel variations < 0.5 % , taken in day-time. • STANDARD Calibrations will not need to be defined by users • For GIRAFFE: all spectra will have 5 fibres dedicated to simultaneous Th-A • If STANDARD calibrations not enough: “Attached” FF calibrations with Nasmyth screen illumination system, BUT night time • Very large number of possible set-ups (Giraffe: 30*5=150; UVES: 3*4=12) : limited number of setups/night, fixed configurations.

  10. INSTRUMENTATION/ L. Pasquini____________________________________________________________ FLAMES LIMITATIONS and WARNINGS • ASTROMETRY! • a) better than ~0.3 arcsec relative • b) VLT Guide star and Fiducial (FACBs) stars in the same astrometric system as targets • ATMOSPHERE! Differential refraction and dispersion (although positioner will position the fibre at the postion corresponding to middle of the exposure) • Calibrations: limited number (4-5) of setups / night • FIXED setups: (e.g. not tunable wavelength domain, no choice of CCD settings, no choice of echelle order, resolving power….) • Short exposures --> low duty cycles

  11. VLT INSTRUMENTATION STC 53, April 24-25,2002 FLAMES CORRECTOR Installation and commissioning beginning of October 2001 Nasmyth illumination system January 2002 L. Pasquini April 2002

  12. VLT INSTRUMENTATION STC 53, April 24-25,2002 FLAMES FIBRE SYSTEM All Fibres have been delivered to ESO and mounted on Oz Poz. 5 fibres (out of 1200) were damaged and were repaired. L. Pasquini April 2002

  13. VLT INSTRUMENTATION STC 53, April 24-25,2002 FLAMES OZ POZ INTEGRATION COMM 1 After PAA, Oz Poz integrated in Paranal and COMM1 took place end March 2002 Quite successful, accuracy plate geometry 0.001, problem with R encoder and friction due to lower temperature at Paranal; will be fixed in June 2002. L. Pasquini April 2002

  14. VLT INSTRUMENTATION STC 53, April 24-25,2002 FLAMES FIRST LIGHT UVES FIBRES March 31 On March 31 acquisition first 7 spectra of giants in O Cen. Exposures of 5, 10 and 10 minutes last made with FLAMES OS. R=47000 Operating whole night from Control Room. Reduced with DRS on the spot L. Pasquini April 2002

  15. VLT INSTRUMENTATION STC 53, April 24-25,2002 FLAMES GIRAFFE PAE March 2002 After first laboratory light on Dec 16, PAE was granted to Giraffe in March 2002 + Very good resolving power and image quality, Resolution, Calibrations for all 30 setups - Lower efficiency (Blue); H-R grating under spec, will be replaced as soon as possible L. Pasquini April 2002

  16. VLT INSTRUMENTATION STC 53, April 24-25,2002 FLAMES GIRAFFE FIRST LIGHT JULY 2, MEDUSA, 60 fibres, 543.1 nm, R=6000 L. Pasquini April 2002

  17. VLT INSTRUMENTATION STC 53, April 24-25,2002 FLAMES STATUS and DEVELOPMENT GIRAFFE re-integrated on platform and tested (2 weeks). No major problems NEXT COMMISSIONING RUN (Oz Poz , Oz Poz + UVES, GIRAFFE) August 18 Sept. 3 Long Way to go… Fix the Positioner Robot Complete Fibre Mounting & HW Fine Tuning Giraffe Plate Geometry at 10-4 Functioning FACBs Positioner Calibration Unit Characterize UVES Characterize Giraffe …... L. Pasquini April 2002

More Related