An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sverre Jarp IT Division CERN CERN’s openlabProject SJ – Nov.2002

  2. openlab plans • Industrial Collaboration • Three year project • Enterasys, HP, and Intel are ourpartners • Technology aimed at the LHC era • Network switchat 10 Gigabits • Rack-mounted HP servers • Itanium Processor Family (IPF) • Storage subsystem may be coming • from a 4th partner • Cluster evolution: • 2002: Cluster of 32 systems (64 G-1 processors) • 2003: 64 systems ( G-2 processors) • 2004: 64 systems (G-3 processors) SJ – Nov.2002

  3. The compute nodes • HP rx-2600 • Rack-mounted (2U) systems • Two Itanium-2 processors • 900 or 1000 MHz • Field upgradable to next generation • 4 GB memory (max 12 GB) • 3 hot pluggable SCSI discs (36 or 73 GB) • On-board 100 and 1000 Mbit Ethernet • 4 full-size 133 MHz/64-bit PCI-X slots • Built-in management processor • Accessible via serial port or Ethernet interface SJ – Nov.2002

  4. openlab - phase 1 • Integrate the openCluster • 32 nodes + development nodes • Rack-mounted DP Itanium-2 systems • RedHat 7.3 • OpenAFS 1.2.7, LSF 4 • GNU, Intel Compilers (+ ORC?) • Database software (MySQL, Oracle?) • CERN middleware: Castor data mgmt • GRID middleware: Globus, Condor, etc. • CERN Applications • Porting, Benchmarking, Performance improvements • CLHEP, GEANT4, ROOT, Anaphe, (CERNLIB?) • Cluster benchmarks • 1  10 Gigabit interfaces Also: Prepare porting strategy for phase 2 SJ – Nov.2002

  5. openlab time line Order/Install 32 nodes Systems experts in place – Start phase 1 Complete phase 1 Start phase 2 Order/Install G-2 upgrades + 32 more nodes Complete phase 2 Start phase 3 EDGinter-operability openClusterintegration Order/Install G-3 upgrades LCGinter-operability End-02 End-03 End-04 End-05 SJ – Nov.2002

  6. The potential ofopenlab • Leverage CERN’s IT strengths • Integrate perfectly into our environment • OS, Compilers, Middleware, Applications • Integrate alongside EDG testbed • Integrate into LCG deployment strategy • Show successfully that the new technologiescan be solid building blocks for the LHC computing environment SJ – Nov.2002