50 likes | 178 Views
Exercise 4. Air Gourmet …. Read the ‘Air Gourmet’ , What are the requirements. Technical, Non technical, Managerial, Budget, …. Air Gourmet (Cont’d) ….
E N D
Air Gourmet … • Read the ‘Air Gourmet’ , • What are the requirements. • Technical, • Non technical, • Managerial, • Budget, • …
Air Gourmet (Cont’d) … • Suppose the the ‘Air Gourmet’ product was implemented exactly as described.Now, instead of using postcards, perceived meal quality is to be determined by means of a telephone interview, • In what ways will the existing product have to be changed? , • Would it be better to discard everything and begin from scratch?
Air Gourmet (Cont’d) • How the four essential problems of SW production (complexity, conformity, changeability, and invisibility) affect the ‘Air Gourmet’ product?
Exercise 4 The End