1 / 15

Missouri River Forecaster’s Meeting January 28-29, 2014

Missouri River Forecaster’s Meeting January 28-29, 2014. Reclamation Reservoir Status. Scott Guenthner Great Plains Regional Office Billings, Montana. Great Plains Region Area Offices and Administrative Areas. Reservoirs in Great Plains Region Total = 80 In MRB = 48

Download Presentation

Missouri River Forecaster’s Meeting January 28-29, 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Missouri River Forecaster’s Meeting January 28-29, 2014 Reclamation Reservoir Status Scott Guenthner Great Plains Regional Office Billings, Montana

  2. Great Plains Region Area Offices and Administrative Areas

  3. Reservoirs in Great Plains Region Total = 80 In MRB = 48 w/Flood Control = 22 Reservoir Locations

  4. Great Plains Region Area Offices and Administrative Areas

  5. Drought Monitor Map Reflects Reclamation Reservoir Storage Condition

  6. Available Space Available Space ---- 2.5 million af Exclusive Flood Control Space ---- 4.0 million af Space available in Fort Peck --- 6 million af

  7. Questions??

More Related