An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Subsystem Mgrs F2F MeetingCalorimeter Subsystem 15 June 2005 J. Eric Grove Naval Research Lab grove@ssd5.nrl.navy.mil J Eric Grove

  2. CAL Status • Completed final CPTs and calibrations on FM 111 – FM 118 • Completed ATDPs and PreShip Reviews on FM 111 – FM 118. • Shipped to SLAC FM 108 – FM 114 • Post-ship testing in progress for FM 111 – FM 114 • Preparing FM 115 – FM 118 for shipment on 23 June. • Assembly and Test of Module 119 • PEM assembled and tested • AFEE boards installed and soldered • TEM/TPS safe-to-mate in progress J Eric Grove

  3. Assembly and Test Completion Started ] This month ] Previously J Eric Grove

  4. CAL Module Milestones Deliveries or Ready to Ship     Shipped 6/6/05  Shipped 6/13/05  Ship 6/23/05 J Eric Grove