NSW Housing Code Forum 12 December 2008. Chris Johnson Executive Director Special Projects Department of Planning. Planning Reforms. 121 days average by metro council to process a DA for detached house 75 days average to process a DA for detached house across NSW
E N D
NSW Housing Code Forum 12 December 2008
Chris Johnson Executive Director Special ProjectsDepartment of Planning
Planning Reforms • 121days average by metro council to process a DA for detached house • 75 days average to process a DA for detached house • across NSW • 10 days proposed for complying development • 11% current take-up for complying development • 50% proposed take-up of complying development
Consultation • 1000 people attended workshops June 2008 • 270 submissions received • 11 trial Councils • Implementation Advisory Committee • Complying Development Expert Panel • Local Government Planning Directors’ Group
Research • 270 projects tested by Peter Smith architect • 30 DCP and LEP provisions reviewed • All State and Territory Complying Development Codes Reviewed
Key Dates • 12 December 08 - Code gazetted • Jan / Feb 09 - Workshops / training • 27 February 09 - Code commences • Mid 09 - Amendments to the Code • 2009 - live testing - amendments • 27 February 10 - review of SEPP
Current Background • Housing Industry low production • Housing Affordability • Commonwealth Government’s First Homeowner Grant • World economic downturn
What sites are excluded? • Environmentally sensitive areas including: • Coastal waters of the State • Coastal lake • SEPP No. 14 Coastal Wetlands or SEPP No. 26 Littoral Rainforests • Aquatic reserve or marine park • Wetlands of int. significance or World Heritage • Land within 100m of Coastal Wetlands, Littoral Rainforests, aquatic reserves, marine parks, wetlands of int. significance or World Heritage
What sites are excluded(continued): • Aboriginal cultural or high biodiversity significance • State conservation areas • Land reserved or dedicated for preservation of flora, fauna, geological formations or environmental protection purposes • Critical habitat under the Threatened Species Conservation Act 1995 or Part 7A of the Fisheries Management Act 1994
What sites are excluded? • Heritage items or draft items • Heritage conservation areas or draft areas • Wilderness areas • Land reserved for acquisition • Land on Acid Sulfate Soils Map (Class 1/2) • Bush fire prone land • Flood control lots
What sites are excluded? Land identified by an environmental planning instrument including within a: • Foreshore scenic protection area • Protected area • Scenic area • Scenic preservation area • Scenic protection area • Special area
Principles for Complying Housing • Site Coverage and Setbacks • Relationship to Neighbours • Appropriate Heights • Adequate Landscaping • Managing Car Parking
The Key Rules • Site requirements • Building Height • Setbacks • Landscaping • Car Parking and access • Earthworks and drainage • Ancillary Development
Four Lots Sizes • Type A450m2 up to 600m2 and minimum primary road frontage of 12m wide • Type B600m2 up to 900m2 and minimum primary road frontage of 12m wide • Type C900m2 up to 1500m2 and minimum primary road frontage of 15m wide • Type D1500m2 and greater and minimum primary road frontage of 18m wide
TYPE A 450m2 – 600m2 TYPE C 900m2 – 1500m2 TYPE B 600m2 – 900m2 TYPE D 1500m2 or greater
Lot drainage All stormwater / surface water run-off from new dwellings, alterations and additions, or ancillary development must be gravity fed via a charged system to: • Street drainage system • Inter-allotment drainage system • On-site disposal system where approved
Ancillary Development • Demolition and removal of buildings • Swimming Pools • Fences • Sheds • Outbuildings
Key Controls PAGE 41 | 12 DECEMBER 2008
Exempt Development Code • Development that: • Has minimal environmental impact • Does not require planning approval if it meets defined criteria • Not on environmentally sensitive land • Meets deemed-to satisfy BCA requirements • Meets manufacturer’s specifications
Local Variations • Front setback • Side setback • Landscaping
Local Variations Process • Councils submit local variations to Department of Planning • Variation application reviewed by independent expert panel • Experts make recommendation to Department of Planning • If Minister makes variation, it is included as a local variation in a schedule to the SEPP
Local Exclusions SEPP establishes standard exclusions across NSW where the Code will not apply Councils can apply for additional local exclusions to the Department of Planning Additional local exclusions can be either: • Zone based • Contained within an environmental planning instrument • Be a precinct identified in a policy or plan as having particular unique attributes that may require a merit assessment of any development proposal
Process for Local Exclusions Council submits application A zone based exclusion will only be approved where the area has particular character attributes that require a merit assessment of any development proposal In some circumstances a local variation will be the preferred approach If the exclusion is approved, it is mapped for identification in the SEPP
Complying Development Requirement Certificate • A Planning Certificate (Complying Development Requirement Certificate) can be generated by a council • Identifies if complying development can be carried out
Covenants - Planned Estates • Some new / existing housing estates have covenants on title for particular development characteristics • Covenants are not affected by the SEPP • Land owners / agents must ensure that the legal requirements of any covenants applying to the land are complied with
Neighbour Notification • Good practice to notify neighbours before lodging any application to council / accredited certifier • No requirement to notify neighbours priorto receiving a complying development certificate • Notify neighbours (within 40m) that a certificate has been issued, within 2 days