1 / 18

1.Status of ST1 2.Status of integration of ST1 and ST2 Jean Peyré CERN - Dec 2006

1.Status of ST1 2.Status of integration of ST1 and ST2 Jean Peyré CERN - Dec 2006. 1.Status of ST1 2.Status of integration of ST1 and ST2. Status of ST1. 1st sept: 3 quadrants Ok (Q2, Q6 & Q7) 3 quadrants with relaxed wires (5 wires (Q3), 1 wire (Q)4 & 1 wire (Q8))

Download Presentation

1.Status of ST1 2.Status of integration of ST1 and ST2 Jean Peyré CERN - Dec 2006

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 1.Status of ST12.Status of integration of ST1 and ST2Jean PeyréCERN - Dec 2006 IPNO-RDD-Jean Peyré

  2. 1.Status of ST12.Status of integration of ST1 and ST2 IPNO-RDD-Jean Peyré

  3. Status of ST1 1st sept: • 3 quadrants Ok (Q2, Q6 & Q7) • 3 quadrants with relaxed wires (5 wires (Q3), 1 wire (Q)4 & 1 wire (Q8)) • 3 quadrants with broken wires (5 wires (Q1), 2 wires (Q5), 200 wires (Q9) • 1st Dec: • 8 quadrants Ok (Q1~>Q8) • Q9 under evaluation (chemichal tests are under progress ) IPNO-RDD-Jean Peyré

  4. 1.Status of ST12.Status of integration of ST1 and ST2 • Installation of supports • Installation of cooling pipes IPNO-RDD-Jean Peyré

  5. Integration of ST1 and ST2CAD IPNO-RDD-Jean Peyré

  6. Integration of ST1 and ST2Orsay IPNO-RDD-Jean Peyré

  7. Integration of ST1 and ST2Point 2 Verifying position of “goujons” in FASS IPNO-RDD-Jean Peyré

  8. Assembly tests ST1/ST2Lifting the rails to the ceiling of the FASS IPNO-RDD-Jean Peyré

  9. Integration of ST1 and ST2Point 2 After 3 weeks …… of hard work IPNO-RDD-Jean Peyré

  10. 1.Status of ST12.Status of integration of ST1 and ST2 • Installation of supports • Installation of cooling pipes IPNO-RDD-Jean Peyré

  11. Cooling for ST1/ST2 TOP OUTLET ST1 ST2 Design issued from previous simulations BOTTOM INLET IPNO-RDD-Jean Peyré

  12. Cooling for ST1/ST2 TOP OUTLET ST1 ST2 BOTTOM INLET IPNO-RDD-Jean Peyré

  13. Cooling for ST1/ST2Bottom – Blowing Air 180m3/h 207m3/h 3.0m/s On each outlet, special grids are fixed for settling airflow 160m3/h 210m3/h 6.2m/s 3.4m/s 207m3/h 210m3/h 6.2m/s 1.0m/s 207m3/h 37m3/h 5.5m/s 1.0m/s 207m3/h 37m3/h 6.0m/s 184m3/h 184m3/h 184m3/h 184m3/h Cooling Quadrants 184m3/h 5.1m/s 184m3/h 5.1m/s Cooling CROCUS 5.7m/s 5.1m/s 5.1m/s 37m3/h 5.1m/s 0m3/h 37m3/h Air output speed of 3-4 m/s 0m3/h 2500m3/h 5-6 m/s IPNO-RDD-Jean Peyré

  14. Cooling for ST1/ST2Bottom – Blowing Air IPNO-RDD-Jean Peyré

  15. Cooling for ST1/ST2Top – Inhaling Air IPNO-RDD-Jean Peyré

  16. Cooling for ST1/ST2Top – Inhaling Air 2500m3/h Air input speed of 3-4 m/s 3-5 m/s Cooling CROCUS 158m3/h 37m3/h 3.5m/s 1.0m/s 158m3/h 37m3/h 1.0m/s 3.5m/s Cooling Quadrants 376m3/h 376m3/h 5.1m/s 5.7m/s 15m3/h 164m3/h 15m3/h 4.9m/s 164m3/h 37m3/h 3.6m/s 1.0m/s 443m3/h 37m3/h 443m3/h 1.0m/s 3.8m/s 3.7m/s Special pipes for Hot spots 20m3/h 20m3/h IPNO-RDD-Jean Peyré

  17. Cooling for ST1/ST2TOP – Inhaling Air IPNO-RDD-Jean Peyré

  18. IPNO-RDD-Jean Peyré

More Related