An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JBSA Energy JBSA Energy team

  2. JBSA Energy Team • Randolph, • Lackland • Fort Sam Houston

  3. Goals • Reduce energy use by 3% per year • Reduce potable water usage intensity by 2% per year • Reduce fuel use by 3% per year • Increase alternative fuels use by 2% per year • Install required electric, gas and water meters; AETC contract(s) • Renewable Energy vs goal not required if not feasible • Audits - accomplished through AETC contract(s) • Energy Security • Enhance base energy infrastructure and facilities • Develop innovative ways to operate & maintain facilities to reduce utility costs • JBSA-wide Awareness campaign

  4. Initiatives Requirements • Building Metering and Control – Methodology to deliver higher energy performance - Last year’s Workshop • Water Conservation and Efficiency – Development and demonstration of technologies • Energy Conservation and Efficiency – Technologies that support sustainable building design and operations • Alternative Energy Sources – Alternative energy from centralized power generation sources • Renewable Energy Generation – Developing and demonstrating renewable technologies • Audit/Commissioning technology – Data collection/modeling for energy sustainability • Innovation Center – share tech info – other people’s money • Energy Efficient Fuels/Vehicles

  5. Energy Intensity vs Goal • Consumption • JBSA MBTU per sqft % vs goal

  6. Utility Cost • Utilities Cost ($000) FY11 & 12

  7. Goal Analysis 000 Kwh

  8. JBSA Energy News • From last year’s workshop • EMCS Project Progress • Lackland • Fort Sam Houston • Randolph*

  9. JBSA Initiatives • Traditional Focus Funding leaving us short • Partnerships (DTI) – Innovation Center • Public Awareness • Commissioning/re-commissioning • High Performance Specification – beyond LEED • ESPCs/ECIP • New Technology Opportunities • ESTCPs; Plasma lighting, facility system, HVAC condensate • AFRL- JBSA facility energy technology; Concentrated Solar • Utility provider • Joint Awareness Campaign • LED Lighting FSH • Home Network • Area-wide Contract ECMs/UESC

  10. Goal Analysis 000 Kwh

  11. Questions?

  12. JBSA/Randolph AFB Virtual Chilled Water Plant

  13. Initial Concept • Central Chiller Plant B991 with TES • ESPC Project to construct chiller plant, Thermal Energy Storage (TES), and interconnect multiple facilities • Removed inefficient building air cooled chillers • Solid results

  14. Replication • B395, B738, and B496 had large centrifugal chiller plants with excess capacity • Interconnect surrounding facilities • Remove inefficient individual air cooled chillers

  15. Plant Interconnection • Excess capacity at B991, B738, B395, and B496. • Interconnect plants • Connect additional buildings on east and south side of installation • Removal of more inefficient air cooled chillers B496 Bldg Bldg Bldg

  16. Replace Plant • B496 AFPC plant reconstructed to serve renovated facility along with additional buildings on west side of installation • Removal of inefficient air cooled chillers, replacement of inefficient centrifugal chillers • Excess capacity available

  17. EMCS Status • Complete FY12 EMCS project to add building BTU metering and central plant optimization • Connect other buildings to virtual plant

  18. Final Randolph Chilled Water Loop Vision • Interconnect B496 to B395 and B991 plants • Install Thermal Energy Storage (TES) at B496 and B395 plants • Perform retro-commissioning of all buildings served by district plants to maximize efficiency and energy savings

  19. JBSA/Randolph AFB End Status and Project Highlights