1 / 9

SPIRE Consortium Meeting La Palma, Oct. 1 – 2 2008 ICC Status Tanya Lim RAL

SPIRE Consortium Meeting La Palma, Oct. 1 – 2 2008 ICC Status Tanya Lim RAL. ICC Organisation. SPIRE ICC Systems Overview Several machines based at RAL but with access from all ICC sites… Propagated Database(s) Remote access e.g. via QLA, ObsExporter Product Pools

alton
Download Presentation

SPIRE Consortium Meeting La Palma, Oct. 1 – 2 2008 ICC Status Tanya Lim RAL

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SPIRE Consortium MeetingLa Palma, Oct. 1 – 2 2008 ICC Status Tanya Lim RAL ICC Status Tanya Lim 1

  2. ICC Organisation ICC Status Tanya Lim 2

  3. SPIRE ICC Systems Overview Several machines based at RAL but with access from all ICC sites… Propagated Database(s) Remote access e.g. via QLA, ObsExporter Product Pools Data Processing and Calibration Products Operational Software and Results (Health Monitoring, Operational Day logging, Trend Analysis etc) Common Uplink System Helpdesk system (RAL) Websites TWiki based at Leuven (main site for information sharing) Wiki based at NHSC (NHSC analysis and results) Test Team Website based at RAL (Test Data) HSC/ESTEC Sites hosting SxR system, NCR system and documentation ICC Status Tanya Lim 3

  4. ICC Status Tanya Lim 4

  5. Operations Team Status Operational Procedures and Interactions Instrument Users Manual Helpdesk SPIRE mailbox is operational AOT Maintenance and Testing CUS Scripts and Procedures Operational Day Logging Instrument Health Monitoring Trend Analysis ICC Status Tanya Lim 5

  6. Calibration Team Status PV Phase Planning Observation Definition Testing PV Phase Uplink Calibration File Design and Population DP Calibration File Design and Population DP Calibration File Testing ICC Status Tanya Lim 6

  7. Observations Group Status DP Requirements Acceptance Testing Scientific Validation ICC Status Tanya Lim 7

  8. Software Team Status SPIRE Data Processing Development So far mostly pipeline oriented although some display tool development has also taken place Full integration into HIPE in progress Interactive Analysis By design pipeline modules can be used for interactive analysis and all tasks can be run interactively, Effort will move to interactive analysis development between now and launch Integration with HIPE is a major step in this process Extended Work Packages Contribution to HCSS/DP ICC Status Tanya Lim 8

  9. Summary The ICC is moving forward with a good working structure This will be maintained going into operations The work division between the teams is generally well understood The work is generally on track to be ready for operations, However, staffing (and expertise of staff) is a perennial issue which remain Many thanks to Ken! ICC Status Tanya Lim 9

More Related