1 / 5

Step-by-Step Guide to Install Aluminium Composite Panels

Master the art of ACP installation! Our guide covers tools, preparation, waterproofing, and more. Achieve flawless results with Alumaze ACP Sheets.

alumaze
Download Presentation

Step-by-Step Guide to Install Aluminium Composite Panels

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Step-by-Step Guide to Install Aluminium Composite Panels

  2. Essential Tools for ACP Installation Gathering the right tools beforehand is crucial for a smooth installation. Required Tools: • Aluminium Composite Panels • Measuring Tape • Level • Electric Saw or CNC Router • Twist Drill • Screws and Adhesive Tape • Brackets and Clamps • Sheet Metal Punching Machines • Three-roll Press Machine and Press Brake Machine • Safety Equipment (Gloves, Goggles, etc)

  3. Preparing the Panels Step 3: Surface Preparation • Ensure the installation surface is clean, dry, and free from debris. • Make necessary adjustments to create a smooth and even base. Step 3: Measurement • Take precise measurements vertically and horizontally using measuring tapes. • Mark the ACP sheets accordingly for accurate installation. Step 3: Fabrication • Fabrication involves several steps for shaping ACP sheets. • Use electric saws for cutting; CNC Router for mass grooving. • U-groove and bend panels at 90 degrees for desired shapes.

  4. Pre-Installation Process Step 4: Waterproofing with AVB • Create an Air Vapor Barrier (AVB) using a rainscreen system. • AVB adhesive sheets prevent water damage and are installed like bumper stickers. • Smooth out wrinkles with hands or J Roller. Step 5: Flashing • Install flashing to manage water flow through the rainscreen system. • Ensure water is directed away from the building. Step 6: Grid Design • The grid ensures aligned and uniform ACP installation. • Plan dimensions, extrusions, backplate locations for a complete blueprint.

  5. ACP Installation and Post-Installation Step 7: Mounting Panels • Mount fabricated sheets over the grid using MS Profiles. • Install cladding boards in predetermined order with nuts and rivets. Step 8: Protective Layer Removal • After installation, peel off the protective layer to reveal the ACP's beauty. • Follow manufacturer's arrow indications for proper peeling. Alumaze ACP Sheets • Alumaze ACP Sheets are flexible and easy to bend. • Prioritize worker safety with appropriate safety equipment. • Choose Alumaze for consistent color and design excellence.

More Related