1 / 7

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG SRU Closing report for July 2013] Date Submitted: [18 July, 2013] Source: [Shoichi Kitazawa] Company [ATR] Address [2-2-2 Hikaridai , Seika, Kyoto, JAPAN]

alva
Download Presentation

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title:[IG SRU Closing report for July 2013] Date Submitted: [18 July, 2013] Source:[Shoichi Kitazawa] Company [ATR] Address [2-2-2 Hikaridai, Seika, Kyoto, JAPAN] Voice:[+81-774-95-1565], FAX: [], E-Mail:[kitazawa@atr.jp] Re:[] Abstract:[IG SRU closing report for July 2013 at Geneva.] Purpose:[Information to 802.15 WG.] Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. Shoichi Kitazawa(ATR)

  2. IEEE 802.15 IG SRU11th Meeting Closing reportGeneva, CHE18 July, 2013 Shoichi Kitazawa(ATR)

  3. IG SRU sessions • Total of 2 time slots • 16 July PM2 • 17July PM2 Shoichi Kitazawa(ATR)

  4. Agenda Items for the week • Presentations • Establishing a Study Group for a Spectrum Resource Utilization (SRU) through Radio Resource Measurement and Management for WPANs (15-13-0404r0) • Processing the work on the new measurement parameters for radio resource management(15-13-0400r0) • Evaluation of Impact of Spectrum Sensing Duration (15-13-0438r0) • Discussions • Plan for September meeting • AOB • Report on progress to WG Shoichi Kitazawa(ATR)

  5. Accomplishment for the meeting • Meeting was called to order 16 July at 16:00 and finished at 16:50. • 14 Attendee • Approve meeting agenda (15-13-0354r1) • Approve meeting minutes • IG SRU May 2013 Minutes(15-13-0344r0) • IG SRU June-July 2013 Teleconference Minutes (15-13-0351r0) • Review and discussion of WNG slide. • Meeting was called to order 17 July at 16:15 and finished at 17:30. • 5 Attendee • Hearing 2 technical contributions. • Processing the work on the new measurement parameters for radio resource management(15-13-0400r0) • Evaluation of Impact of Spectrum Sensing Duration (15-13-0438r0) Shoichi Kitazawa(ATR)

  6. Accomplishment for the meeting(Cont’d) Motion to establishing SG was made at WG15 mid plenary. Motion: that the 802.15 Working Group seeks approval from the 802 EC to form a study group in 802.15 to develop the PAR and 5c documents for Spectrum Resource Utilization (SRU)Moved by: Shoichi KitazawaSeconded by: Shusaku ShimadaResults :Y/N/A 47/0/2 Shoichi Kitazawa (ATR)

  7. Plans for September Meeting • 3 meeting slot. • Hearing presentations. • Discussion about PAR and 5C. Shoichi Kitazawa(ATR)