1 / 14

Grid Coupling in TIMCOM

Grid Coupling in TIMCOM. 鄭偉明 TAY Wee-Beng Department of Atmospheric Sciences National Taiwan University. Motivation. Multi-domain problems Problems which require 2 or more domains (grids) to solve efficiently. Arises due to difference in topography or restriction in computation resources.

alyson
Download Presentation

Grid Coupling in TIMCOM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Grid Coupling in TIMCOM 鄭偉明 TAY Wee-Beng Department of Atmospheric Sciences National Taiwan University

  2. Motivation • Multi-domain problems • Problems which require 2 or more domains (grids) to solve efficiently. • Arises due to difference in topography or restriction in computation resources.

  3. Objective • To transfer values from grid A to B and vice versa efficiently and conservatively • Efficiently • Algorithm must not take up too much computational resources. • Relatively simple to program. • Conservatively • Flux must be conserved, minimal dissipation. • No appearance of unrealistic value. • To ensure stability

  4. Multi-domain examples • From simple to complex

  5. Multi-domain in TIMCOM • Features • Both Cartesian grids (TAI and NPB) • Same orientation, fixed in space • NPB is twice the size of TAI • Boundary faces of TAI positioned exactly at center of NPB cells

  6. Algorithm: TAI to NPB grid • UWNPB(JJ,K)= U(I3,J,K) +U(I3,J+1,K) • UWNPB is west face value • U(I,J,K) from TAI • I3 = I0-3

  7. Algorithm: TAI to NPB grid • U2NPB(JJ,K)=0.25*[U2(I2,J,K)+ U2(I1,J,K)+ U2(I2,J+1,K)+ U2(I1,J+1,K)] • U2NPB is center value • U2NPB = U@(I=2) • U2(I,J,K) from TAI • I2 = I0-2 • Average of 4 values • Same for V, S and T • Same for U1NPB, except different cell

  8. Using interpolated values in NPB • U(1,127,K)=IN(2,127,K)*(FLT1*UWNPB(J,K)+FLT2*U(1,127,K)) • U(1,127,K) is face value • IN - Mask array for scalar quantities IN(I,J,K)=1,0 for water, land respectively • UWNPB - Interpolated face value from TAI • FLT1/2 – time filter to improve stability since TAI has finer grid, smaller time step. Use part of old value to improve stability

  9. Using interpolated values in NPB • TMP=U2NPB(J,K)-U1(2,N,K) • TMP represents a small incremental difference • Same effect as previous case to improve stability • U2(2,N,K)=U2(2,N,K)+TMP • U2(2,N,K) is center value • To give a smaller and smoother increment • Improves stability • Same for V, S and T

  10. Using interpolated values in NPB • U2(1,N,K)=U1NPB(J,K) • U2(1,N,K) is center value • U1NPB - Interpolated center value from TAI • U1NPB = U@(I=1) • Same for V, S and T • No time filter due to spatial averaging

  11. Algorithm: NPB to TAI grid • UETAI(J,K)=U(2,(J-2)/2+127,K) • UETAI is east face value • U(I,J,K) from NPB

  12. Algorithm: NPB to TAI grid • UI0TAI(J,K)=U2(3,(J-2)/2+127,K) • UI0TAI is center value • U2(I,J,K) from NPB • Same for V, S and T

  13. Using interpolated values in TAI • U(I1,J,K)=IN(I1,J,K)*UETAI(J,K) • U(I1,J,K) is face value • IN - Mask array for scalar quantities IN(I1,J,K)=1,0 for water, land respectively • No time filter • U2(I0,J,K)=UI0TAI(J,K) • U2(I0,J,K) is center value • No time filter and IN multiplication required

  14. Conclusion • Multi-domain problems requires the use of grid coupling • Objective to transfer values from one grid to another • Efficient and conservative algorithm • Use of filter to ensure smooth transition and stability

More Related