1 / 8

Referanser Kraftstasjoner

Referanser Kraftstasjoner. Framruste (1x85MW), Øyberget (1x69MW, 1x29MW, 1x10MW) Øvre Otta Vannkraft Øst . Kundens behov En pålitelig leverandør av førsteklasses produkter og kompetanse Strenge miljøplaner må følges, uten unntak ABBs løsning

amal
Download Presentation

Referanser Kraftstasjoner

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Referanser Kraftstasjoner

  2. Framruste(1x85MW), Øyberget (1x69MW, 1x29MW, 1x10MW)Øvre Otta Vannkraft Øst Kundens behov • En pålitelig leverandør av førsteklasses produkter og kompetanse • Strenge miljøplaner må følges, uten unntak ABBs løsning • Kontroll- og vernsystemer, 12 og 24 kV apparatanlegg, isolerte samleskinner, hjelpesystem og 145 kV kabelanlegg • Montasje og idriftsettelse med assistanse fra lokale selskaper for verdiskaping • Lang erfaring fra HMS-arbeid resulterte i HMS-plan som ble godkjent av kunden Verdi for kunden • En leveranse med høy miljøfokus og kort leveringstid til en riktig markedspris 2003-2005

  3. SISO, Fauske (1x94MW, 1x130MW) Elkem Energi PICTURE JPG-FORMAT WEB OPTIMIZED RESOLUTION Kundens behov • Kostnadseffektiv løsning for oppgradering av SISO kraftverk for å forlenge levetiden med 35 år ABBs løsning • Et moderne kontroll- og vernsystem • Montasje utføres av personell fra kunden og ABB Verdi for kunden • Kostnadseffektiv løsning som bidrar til forlenget levetid og optimal utnyttelse av vannressursene 2003-2004

  4. Blåfalli Vik kraftverk (1x230 MW), Sunnhordland Kraftlag AS Kundens behov • Erstatte Blåfalli I og II for å fjerne en flaskehals i produksjonsstrengen ABBs løsning • ABB leverer apparat- og kontrollanlegg • Anleggstart i 2004 (beregnet byggetid på 2,5 år) Verdi for kunden • Kraftverket erstatter dagens Blåfalli I og II • Byggingen fjerner en flaskehals og fører til økt produksjon

  5. Birkapili (1x66MW), TurkeyERE Hidroelektrik Customer’s need • ERE Hidroelektrik needed a reliable partner for a cost effective Hydro Power Plant ABB’s response • ABB delivers Control, Protection, Electrical Balance of Plant and Substation • ABB in Norway and Turkey in cooperation with GE Hydro forms a strong team • A plain, functional solution offered • Local presence and knowledge of market requirements for cost effectiveness Customer’s benefits • ERE Hidroelektrik obtains a Hydro Power Plant at fair market pricing, with well known ABB products and a professional contractor able to meet technical and logistic challenges

  6. Yixing(4x250MW), ChinaJiangsu Pumped Storage Power Co. Ltd/GE Customer’s need • New pumped storage plant to strengthen the supply of electricity in part of Eastern China • Technically advanced power products and systems to secure high reliability ABB’s response • In partnership with GE ABB provides Control, Protection and Electrical Balance of Plant Customer’s benefits • Considerable experience in the Power Systems business and knowledge of China provides high reliability and availability • The delivery will strengthen the power supply in an area which suffers from severe power shortages due to growing demand

  7. Rio General(2x23MW)Hidroenergía del General/SARET Costa Rica Customer’s need • Hidroenergía del General needed a reliable partner for a cost effective Hydro Power Plant for the development of infrastructure in Costa Rica ABB’s response • In partnership with GE ABB provides Control, Protection, Electrical Balance of Plant • 13,8/138 kV Plant Substation • Extension of Leesville Substation Customer’s benefits • Hidroenergía del General obtains a Hydro Power Plant at fair market pricing, with well known ABB products and a professional contractor able to meet technical and logistic challenges. • The delivery will contribute to increased economic development in Costa Rica

More Related