Workflow Verification Project

Workflow Verification Project. BY: Toomas K ü tt Fraz Tabassam Jens K aae Christensen. Check Order. a1_ch. a2_ch. Get Products. a3_ch. AND. OR. a2_ch. Save Order Information in Archive. a7_ch. a5_ch. Test Computer. a4_ch. a11_ch. Assemble Bundle. a10_ch. a9_ch. OR.

amanda
Download Presentation

Workflow Verification Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Workflow Verification Project BY: Toomas Kütt Fraz Tabassam Jens Kaae Christensen

  2. Check Order a1_ch a2_ch Get Products a3_ch AND OR a2_ch Save Order Information in Archive a7_ch a5_ch Test Computer a4_ch a11_ch Assemble Bundle a10_ch a9_ch OR AND Test Monitor a5_ch a8_ch

  3. a2_ch a1_ch a3_ch Check Order Get Products a2_ch Save Order Information in Archive a7_ch a5_ch Test Computer a4_ch a11_ch Assemble Bundle a10_ch a9_ch Test Monitor a5_ch a8_ch

  4. Variable declarations: Number of running activity nodes int running; Resources: int r1, r2, r3, r4, r5, r6; Global declaration of channels: urgent chan letsstart, a1_channel, a2_channel, a3_channel, a4_channel, a5_channel, a7_channel, a8_channel, a9_channel, a10_channel, a11_channel; Clocks (local, one for each activity): clock clock1, clock2, clock3, clock4, clock5, clock6;

  5. Node declarations (Communicating Finite Automatas) Figure 2: Activity Parameters: - clock &processclock, - const int mintime, - const int maxtime, - int &resource, - urgent chan &in_channel, - urgent chan &out_channel

  6. System declarations: • CheckOrder = Activity(clock1,1,2,r1, letsstart, a1_channel); • Split1 = ANDsplit(a1_channel, a2_channel); • GetProducts = Activity(clock2,1,2,r2, a2_channel, a3_channel); • SaveOrderInformInArchive = Activity(clock3,1,2, r3, a2_channel, a4_channel); • Split2 = ORsplit(a3_channel, a5_channel); • TestComputer = Activity(clock4,1,2, r4, a5_channel,a7_channel); • TestMonitor = Activity(clock5,1,2, r5, a5_channel, a8_channel); • Join1 = ORjoin(a7_channel, a8_channel, a9_channel); • Join2 = ANDjoin(a4_channel, a9_channel, a10_channel); • AssembleBundle = Activity(clock6, 1, 2, r6, a10_channel, a11_channel); • end = EndNode(a11_channel);

  7. System definition: StartNode, CheckOrder, GetProducts, SaveOrderInformInArchive, TestComputer, TestMonitor, AssembleBundle, end, Split1, Split2, Join1, Join2;

  8. Answers to questions: • • Use UPPAAL to verify that: • 1) The end node will always be reached • - A<> p: p holds in some state along every path • - Query: A<> end.finished • 2) When the end node is reached no activities are waiting to get finished • - A[] p: p holds in every reachable state •  - Query: A[] end.finished imply running == 0 • 3) The workflow is structurally incorrect if the implicit join is modeled as a merge • Query: A<> end.finished (deadlock)

  9. 4) Assemble bundle and get products may share a resource without conflict - A[] p: p holds in every reachable state - Query: A[] r6<2 : (property is satisfied) 5) There is a conflict if “get products” and “save order information” share a resource - Query:A[] r2<2 :(property is not satisfied) 6) With time intervals [1,2] the entire workflow can be completed in 8 units - E<> p: p holds in some reachable state. - Query:E<> end.finished and clock1<=8 - Query: A<> end.finished and clock1<=8

  10. 7) This still holds even if “save order information” gets interval [2,3] (explain why)  - Same queries, “save order” set to [2,3]: - Query:E<> end.finished and clock1<=8 8) Show that “get products” is always executed before “assemble bundle” - A[] AssembleBundle.working imply GetProducts.finished