1 / 48

N eutrinos options at CERN

N eutrinos options at CERN. R. Garoby – 27/04/2009. OUTLINE. Context: plans for future LHC injectors Potential neutrino options 2.1 “Conventional” n beams: CNGS SPS with the new injectors Low energy n “Super-beam” 2.2 Neutrino Factory 2.3 Beta beams 3. Summary.

amandla
Download Presentation

N eutrinos options at CERN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Neutrinos options at CERN R. Garoby – 27/04/2009

  2. OUTLINE • Context: plans for future LHC injectors • Potential neutrino options • 2.1 “Conventional” n beams: • CNGS • SPS with the new injectors • Low energy n “Super-beam” • 2.2 Neutrino Factory • 2.3 Beta beams • 3. Summary

  3. Plans for future LHC injectors

  4. Motivation • 1. Reliability ­ • The present accelerators are getting old (PS is 48 years old !) and they operate far beyond their initial design parameters • Þ need for new accelerators designed for the needs of SLHC • 2. Performance ­ • Brightness N/e* of the beam in LHC must be • increased beyond the capability of the present • injectors to allow for phase 2 of the LHC upgrade. • [Excessive incoherent space charge tune spreads • DQSC at injection in the PSB and PS]. • Þ need to increase the injection energy in the synchrotrons • Increase injection energy in the PSB from 50 to 160 MeV kinetic • Increase injection energy in the SPS from 25 to 50 GeV kinetic • Design the PS successor (PS2) with an acceptable space charge effect for the maximum beam envisaged for sLHC => injection energy of 4 GeV.

  5. Description Proton flux / Beam power 50 MeV Linac2 Linac4 160 MeV LP-SPL: Low Power - Superconducting Proton Linac (4-5 GeV) PS2: High Energy PS (~ 5 to 50 GeV – 0.3 Hz) SPS+: Superconducting SPS (50 to1000 GeV) sLHC: “Super-luminosity” LHC (up to 1035 cm-2s-1) DLHC: “Double energy” LHC (1 to ~14 TeV) PSB (LP)SPL 1.4 GeV 4 GeV PS 26 GeV PS2 50 GeV Output energy SPS 450 GeV SPS+ 1 TeV LHC / SLHC DLHC 7 TeV ~ 14 TeV

  6. PS2 parameters PS2 goals: • to provide the beam brightness required by all sLHC options • to improve SPS operation in fixed target mode

  7. PS2 injector Requirements of PS2 on its injector:

  8. Why an SPL? • An H- linac combined with charge exchange injection in the following synchrotron is a proven solution for reliably reaching high beam brightness, • Superconducting accelerating structures allow for reaching 4 GeV with a single accelerator (minimum beam loss/irradiation + maximum reliability), • An SPL provides a large potential of extension to adapt to future needs. Among the identified possibilities: • Radioactive ion beam facility (4 MW at ~ 2.5 GeV) • Proton driver for a neutrino factory (4 MW at 5 GeV) [design available] • e+/e- acceleration to ~20 GeV (using recirculation in the b=1 part of the SPL) for LHeC [preliminary study in progress] • Large synergy with other projects (ESS, ADS, EURISOL, SNS…) and access to EU support for R & D.

  9. 160 MeV 50 MeV 3 MeV 102 MeV H- source RFQ DTL chopper CCDTL PIMS 352.2 MHz Implementation of the new injectors: Stage 1 (1/2) LINAC4 Layout Beam characteristics

  10. Implementation of the new injectors: Stage 1 (2/2) • Milestones • End CE works: December 2010 • Infrastructure: 2011 • Installation: • 2011-2012 • Commissioning: 2012-2013 • Modifications PSB: shut-down 2013/14 • Beam from PSB: 1rst of April 2014

  11. 160 MeV 4 GeV 50 MeV 643 MeV 3 MeV 102 MeV H- source RFQ DTL chopper CCDTL PIMS β=0.65 β=0.92 352.2 MHz 704.4 MHz Implementation of the new injectors: Stage 2 (1/4) LP-SPL + PS2 Linac4 (160 MeV) SC-linac (4 GeV) Length: 470 m LP-SPL beam characteristics

  12. Implementation of the new injectors: Stage 2 (2/4) LP-SPL + PS2 Construction of LP-SPL and PS2 will not interfere with the regular operation of Linac4 + PSB for physics. Similarly, beam commissioning of LP-SPL and PS2 will take place without interference with physics. Critical path: Design Study & Civil Engineering! DRAFT • First milestones • Project proposal: 2011- 2012 • Project start: January 2013

  13. Implementation of the new injectors: Stage 2 (3/4) Site layout SPS PS2 ISOLDE PS SPL Linac4

  14. Implementation of the new injectors: Stage 2 (4/4)

  15. 160 MeV 5 GeV 50 MeV 643 MeV 3 MeV 102 MeV H- source RFQ DTL chopper CCDTL PIMS β=0.65 β=1.0 352.2 MHz 704.4 MHz Implementation of the new injectors: Stage 3 (1/2) HP-SPL Linac4 (160 MeV) SC-linac (5 GeV) HP-SPL beam characteristics

  16. Implementation of the new injectors: Stage 3 (2/2) HP-SPL • The upgrade from LP-SPL to HP-SPL will depend upon the approval of major new physics programmes for Radioactive Ion beams (EURISOL-type facility) and/or for neutrinos (Neutrino factory). • Staged hardware upgrade during shutdowns • Earliest year of operation: >2020

  17. Potential neutrino options

  18. CERN Gran Sasso CONVENTIONAL n BEAMS: CNGS (1/2) from E. Gschwendtner • 732 km baseline • From CERN to Gran Sasso (Italy) [Elevation of 5.9°] • Far detectors: • OPERA (1.21 kt), Icarus (600 t) • Commissioned 2006 • Operational since 2007 Proton beam characteristics • From SPS: 400 GeV/c • Cycle length: 6 s • Extractions: • 2 separated by 50ms • Pulse length: 10.5ms • Beam intensity: • 2x 2.4 · 1013 ppp • s ~0.5 mm • Beam performance: • 4.5· 1019 pot/year

  19. TBID 2.7m 43.4m 100m 1095m 18m 5m 67m 5m CONVENTIONAL n BEAMS: CNGS (2/2) from E. Gschwendtner p + C (interactions) p+,K+  (decay in flight) m+ + nm • Air cooled graphite target magazine • 4 in situ spares • 2.7 interaction lengths • Target table movable horizontally/vertically for alignment • TBID multiplicity detector • 2 horns (horn and reflector) • Water cooled, pulsed with 10ms half-sine wave pulse of up to 150/180kA, 0.3Hz, remote polarity change possible • Decay pipe: • 1000m, diameter 2.45m, 1mbar vacuum • Hadron absorber: • Absorbs 100kW of protons and other hadrons • 2 muon monitor stations: muon fluxes and profiles

  20. CONVENTIONAL n BEAMS: SPS with new injectors (1/3) from M. Meddahi

  21. CONVENTIONAL n BEAMS: SPS with new injectors (2/3) from M. Meddahi

  22. CONVENTIONAL n BEAMS: SPS with new injectors (3/3) from M. Meddahi Performance range: 2 – 4 x flux for CNGS

  23. n FACTORY: SPL-based proton driver (1/4) from M. Aiba • An HP-SPL based 5 GeV – 4 MW proton driver has been designed [HP-SPL + 2 fixed energy rings (accumulator & compressor)]

  24. n FACTORY: SPL-based proton driver (2/4) Accumulator [120 ns pulses - 95 ns gaps] SPL beam [42 bunches - 33 gaps] Compressor [120 ns bunch - V(h=3) = 4 MV] Target [2 ns bunches – 5 times]

  25. n FACTORY: SPL-based proton driver (3/4) from M. Aiba

  26. n FACTORY: SPL-based proton driver (4/4) from M. Aiba Only the accumulator would be needed for a low energy n superbeam

  27. g=100 b BEAM FACILITY: Principle from E. Wildner • Aim: production of (anti-)n beams from the b decay of radio-active ions circulating in a storage ring • Similar concept to the n factory, but parent particle is a b-active isotope instead of a m. • Beta-decay at rest • n-spectrum well known from electron spectrum • Reaction energy Q typically of a few MeV • Accelerate parent ion to relativistic gmax • Boosted n energy spectrum: En  2gQ • Forward focusing of n:   1/g • Pure electron (anti-)n beam! • Depending on b+- or b- - decay we get a n or anti-n • Two different parent ions for n and anti-n beams • Physics applications of a beta-beam • Primarily n oscillation physics and CP-violation • Cross-sections of n-nucleus interaction Aim: production of (anti-)neutrino beams from the beta decay of radio-active ions circulating in a storage ring • Similar concept to the neutrino factory, but parent particle is a beta-active isotope instead of a muon. Beta-decay at rest • n-spectrum well known from electron spectrum • Reaction energy Q typically of a few MeV • Accelerate parent ion to relativistic gmax • Boosted neutrino energy spectrum: En  2gQ • Forward focusing of neutrinos:   1/g • Pure electron (anti-)neutrino beam! • Depending on b+- or b- - decay we get a neutrino or anti-neutrino • Two different parent ions for neutrino and anti-neutrino beams • Physics applications of a beta-beam • Primarily neutrino oscillation physics and CP-violation • Cross-sections of neutrino-nucleus interaction

  28. top-down approach b BEAM FACILITY: EURISOL scenario from E. Wildner • Based on CERN boundaries • Ion choice: 6He and 18Ne • Based on existing technology and machines • Ion production through ISOL technique • Bunching and first acceleration: ECR, linac • Rapid cycling synchrotron • Use of existing machines: PS and SPS • Relativistic gamma=100 for both ions • SPS allows maximum of 150 (6He) or 250 (18Ne) • Gamma choice optimized for physics reach • Opportunity to share a Mton Water Cherenkov detector with a CERN super-beam, proton decay studies and a neutrino observatory • Achieve an annual neutrino rate of • 2.9*1018 anti-neutrinos from 6He • 1.1 1018 neutrinos from 18Ne • The EURISOL scenario will serve as reference for further studies and developments: Within Euron we will study 8Li and 8B

  29. ISOL method at 1-2 GeV (200 kW) > 1 10136He per second < 8 101118Ne per second Studied within EURISOL Direct production > 1 1013 (?) 6He per second 1 101318Ne per second Studied at LLN, Soreq, WI and GANIL Production ring 1014 (?) 8Li > 1013 (?) 8B Will be studied within EURO-n b BEAM FACILITY: Ions production schemes (1/2) from E. Wildner Aim: He 2.9 1018 (2.0 1013/s) Ne 1.1 1018 (2.0 1013/s) Courtesy M. Lindroos

  30. b BEAM FACILITY: Ions production schemes (2/2) from E. Wildner Courtesy M. Lindroos

  31. Summary

  32. (1/2) • There has been significant progress during the past years in the definition of CERN future proton accelerators for the needs of LHC • The possibility to upgrade to high beam power has been studied and kept compatible with the proposals • HOWEVER • Schedule is continuously shifting (level of resources + better understanding of Civil Engineering needs…) • Numerous issues deserve special investigation to prepare for multi-MW proton drivers (Beam dynamics and hardware design for the accelerators, Design of target and target area…) • The possibility to upgrade to high beam power will have a cost: approval by the CERN Council cannot be taken as granted.

  33. (2/2) • MILESTONES • 2009: “Definition of the CERN scientific strategy” • 10-13 May 2009: workshop on New Opportunities in the Physics Landscape at CERN • September 2009: workshop on neutrino physics (organized by a working group of the CERN SPC) • 2012: “Authorization of the new projects” • June 2012: Council decision (the whole planning is locked on the starting date) J If the case for a high power SPL is strong, it would be ideal to immediately implement it. L If the high power option is considered of too low interest, the investment required to implement it later can be rejected. • End of 2010’s: “Start of commissioning of sLHC”

  34. THANK YOU FOR YOUR ATTENTION!

  35. SPARE SLIDES

  36. Linac4 accelerating structures PIMS Linac4 accelerates H- ions up to 160 MeV energy: • in about 80 m length • using 4 different accelerating structures, all at 352 MHz • the Radio-Frequency power is produced by 19 klystrons • focusing of the beam is provided by 111 Permanent Magnet Quadrupoles and 33 Electromagnetic Quadrupoles A 70 m long transfer line connects to the existing line Linac2 - PS Booster

  37. Linac4 civil engineering Equipment building ground level Linac4 tunnel Linac4-Linac2 transfer line Low-energy injector Access building

  38. Equipment Hall (Bld. 400)

  39. Linac4 tunnel cross-section Final position of cable trays:

  40. REFERENCES- SPL -

  41. http://cdsweb.cern.ch/record/1136901/files/CERN-AB-2008-067.pdfhttp://cdsweb.cern.ch/record/1136901/files/CERN-AB-2008-067.pdf

  42. Comparison of frequencies (1/2)

  43. Comparison of frequencies (2/2)

  44. Conclusions of the assessment

  45. SPL cryomodules

  46. REFERENCES- Site Layouts (Stage 3) -

  47. Plan for a Radioactive Ion Beam Facility (Stage 3) HP-SPL EURISOL EXPERIMENTAL HALLS RADIOACTIVE IONS LINAC TARGETS ISOLDE OR EURISOL HIGH ENERGY EXPERIMENTAL HALL TRANSFER LINE SPL to ISOLDE TRANSFER LINES SPL to EURISOL

  48. Plan for a Neutrino Factory (Stage 3) MUON ACCELERATORS MUON PRODUCTION TARGET MUON STORAGE RING ACCUMULATOR & COMPRESSOR SPL

More Related