1 / 23

GEOSS components testing procedure

GEOSS components testing procedure. 14 th ADC – Pretoria – 20 th May 2010. Outline. GCI components selection Selection criteria Tests Roadmap 1st Phase: Clearinghouse selection 2nd Phase: GeowebPortal selection Results Conclusions. GCI-CT: Background.

Download Presentation

GEOSS components testing procedure

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GEOSS components testing procedure 14th ADC – Pretoria – 20th May 2010

  2. Outline • GCI components selection • Selection criteria • Tests Roadmap • 1st Phase: Clearinghouse selection • 2nd Phase: GeowebPortal selection • Results • Conclusions

  3. GCI-CT: Background • 2009 GEO VI Plenary endorsed the GCI architecture recommended by the IOC TF. • single GEO Web Portal (GWP) and a single Clearinghouse (CH) • GCI Coordination Team (GCI-CT) created to define the selection process and oversee the long-term operations of GCI. • GCI-CT Kick-off Meeting, Feb 23-24, 2010.

  4. GCI Contributors • Component and Service registry (CSR): • USGS/George Mason University (USA, Dept. of Interior) • Standard and Interoperability register : IEEE • Best Practices Wiki: IEEE • GEOSS Clearinghouses (CLHs, 3): • Compusult (Private company) • ESRI (Private Company) • USGS (US) • GEO Web Portals (GWPs, 3): • Compusult • ESRI • ESA/FAO (GEO Partic. Org.)

  5. Operational scenario: single versus multiple GCI components USER USER USER GWP1 GWP2 GWP3 GWP GWP1 GWP2 GWP3 CL CL CL1 CL2 CL3 CSR CSR CSR (1st Phase)Single CL / multiple Web Portal GCI configuration operational phase 2010-2015 (2nd Phase)Single CL / single Web Portal GCI configuration operational phase 2010-2015 Current GCI configuration IOC phase 2008-2009 Endorsed by Plenary

  6. Selection Criteria

  7. Compliance to Consolidated Req. • Actors: • GCI Coordination Team (CT ) • Components providers • Test team • Joint Research Center (JRC, EU ) • National Institute for Space Research (INPE, Brazil) • GCI Consolidated requirements (Common/Specific) • Service availability, • Quality management of content, • General user functionality • ...

  8. GCI Component Testing Roadmap – Phase 1 • Responses to GEO SEC letter with criteria (19 Mar):Action: Providers • Self-Testing by CSR, CL, GWP (22 to 26 Mar)Action: Providers • Phase 1: CSR, CL testing (29 March to 13 Apr)Action: JRC & INPE • Report of CSR, CL testing (20 Apr)Action: JRC & INPE • Clearinghouse to be selected for test phase 2 (27 April)Action: GCI CT

  9. GCI Component Testing Roadmap – Phase 2 • GWP to reconfigure their systems (28 April to 6 May)Action: GWP Providers • Phase 2: GWP testing with selected CL (7 to 17 May)Action: JRC & INPE • Phase 2: GWP Usability testing with sel. CL (17 to 20 May)Action: US EPA • Interim Reports of 1) GWP testing and 2) Usability testing (28 May) Action: 1) JRC and INPE, 2) US EPA • Final Reportsof 1) GWP testing and 2) Usability testing(Mid-June) Action: 1) JRC and INPE, 2) US EPA

  10. 1st Phase: CSR & Clearinghouse Selection Source: “AIP-2 Design Review Catalogue, Clearinghouse, Registry, Metadata (CCRM) WG Use Case Review”, Josh Lieberman – GEOSS AIP-2 Design Review, 2 December 2008

  11. 1st Phase: tests (CSR)

  12. 1st Phase: tests (Clearinghouses)

  13. 1st Phase: tests (results) • Component and Services Registry (CSR) • Clearinghouses

  14. CSR test: example

  15. CSR test result: example (1)

  16. CSR test result: example (2)

  17. Test multiplication… CL-1 USGS ESRI Compusult CSW 2.0.2 Z39.5 CSW 2.0.2 Z39.5 CSW 2.0.2 Z39.5 2.a 2.b 2.c 2.d 2.a 2.b 2.c 2.d 2.a 2.b 2.c 2.d 2.a 2.b 2.c 2.d 2.a 2.b 2.c 2.d 2.a 2.b 2.c 2.d

  18. GCI Component Testing Roadmap – Phase 2 • GWP to reconfigure their systems (28 April to 6 May)Action: GWP Providers • Phase 2: GWP testing with selected CL (7 to 17 May)Action: JRC & INPE • Phase 2: GWP Usability testing with sel. CL (17 to 20 May) Action: US EPA • Interim Reports of 1) GWP testing and 2) Usability testing (28 May) Action: 1) JRC and INPE, 2) US EPA • Final Reportsof 1) GWP testing and 2) Usability testing(Mid-June) Action: 1) JRC and INPE, 2) US EPA

  19. 2nd Phase: tests (GWP)

  20. GCI-CT: recent Activities • Weekly telecons since GEO Plenary • Draft functional test procedures (Feb 18, 2010) • GCI-CT Kick-off meeting (Feb 23-24, 2010) • Consolidation of Work Plan & Consolidated Requirements • Definition of Selection Process and Test Logic • Agreement of Weights on criteria • Draft Letter with criteria to GCI Providers • Letter sent to GCI Component Providers(2 March 2010)

  21. GCI-CT: recent Activities • Meeting GCI-CT and Test Teams (INPE, JRC)(3 March 2010) • Optimization of test logic • Consolidation of Work Plan • Establishment of rating system • Assessment of Test Procedures by Test Teams (INPE, JRC) (8 March 2010)

  22. GCI-CT: Deliverables to ExCom-18 • GCI-CT Terms of Reference: ExCom Document 8 • Recommendations for Long-Term Operations of the GCI: updated version of 5 March 2010 • Action (Work) Plan: updated version of 5 March 2010 • Note, further update still needed to reflect the Test Phases and associated milestones dates. • Consolidated Requirements – updated • Note, further update still needed to include a new requirement relative to the time notice (90 days) for a GCI Provider to inform the GEO Secretariat in case of their cessation of GCI operations.

  23. Conclusions • The process is underway that will lead to a recommendation on the single Clearinghouse and GEO Web Portal being prepared for EXCOM, with the expectation that this recommendation can be made available by mid-June 2010. • It is important that this timescale is adhered to, as there is a clear need to complete the selection process as soon as possible, in order to allow the selected GCI Component Providers to work together to ensure that a truly operational GCI is implemented in advance of the GEO Ministerial Summit.

More Related