120 likes | 528 Views
The Mariners Load Releasing Hitch. Required Materials: Two Large Carabiners One 60” Rescue Runner One Dissimilar Carabiner. Clip one end of the rescue runner into a large carabiner. Run the opposite end through the second carabiner. Continue back through the first carabiner.
E N D
Required Materials: • Two Large Carabiners • One 60” Rescue Runner • One Dissimilar Carabiner
Pull carabiners 8”-10” apart and begin to wrap the rescue runner around the two parallel strands
Pass the end of the rescue runner between the two strands near the second carabiner
Attach the dissimilar carabiner to the end of the rescue runner
To transfer a load - Start by unclipping the dissimilar carabiner & re-clipping it around the parallel strands.