1 / 1

DRM2

DRM2. 1.1m uTMA telescope, single channel, 2.4um cutoff 6x2 H4RG(-10) @0.18”/pixel, ~0.50 sq. deg Falcon9 LV to L2 orbital position 6 position Filter wheel plus shutter: 4 bandpass filters, ~1.0-2.4um; SN prism, uL wide filter, Insertable GRS prism in 2 nd wheel

amena
Download Presentation

DRM2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DRM2 • 1.1m uTMA telescope, single channel, 2.4um cutoff • 6x2 H4RG(-10) @0.18”/pixel, ~0.50 sq. deg • Falcon9 LV to L2 orbital position • 6 position Filter wheel plus shutter: • 4 bandpass filters, ~1.0-2.4um; SN prism, uL wide filter, • Insertable GRS prism in 2nd wheel • Enables galaxy redshift survey • Aggressive schedule: project will push on 72 month ICE Probe baseline; use extended early phases to get H4RG(-10) to TRL6 • WL must be goal/best effort • Selective redundancy • Phase E: 36 mo to be chosen from: • #1 15mo uL, • #2 6mo SN; • #3 15mo GO +gal plane • #4 12 mo imaging survey • #5 12 mo galaxy redshift survey • Will quantify return for extended mission out to 10yr • H4RG backup: H2RG with larger pixel scale [9x4 @0.21”/pixel] • Options: • IFU v. SN prism in wheel • Improve SN return & systematics

More Related