Presentazione documenti inviati al RRB ( Ottobre 05)

Punti di rilievo nella preparazione dell’ RRB Novità dalla ATLAS Overview week Piano finanziario complessivo di Atlas. Bilancio 2006: CC C&I (A e B) CtC (A e B) M&O A & B 2006. Presentazione documenti inviati al RRB ( Ottobre 05). Commissione Scientifica Nazionale I 10 ottobre 2005

Download Presentation

Presentazione documenti inviati al RRB ( Ottobre 05)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Punti di rilievo nella preparazione dell’ RRB • Novità dalla ATLAS Overview week • Piano finanziario complessivo di Atlas. • Bilancio 2006: • CC • C&I (A e B) • CtC (A e B) • M&O A & B 2006 Presentazione documenti inviati al RRB( Ottobre 05) Commissione Scientifica Nazionale I 10 ottobre 2005 M. Livan on behalf of L.Mandelli

  2. Barrel Toroid Struttura liberata dai supporti esterni il 29/9/2005 Deformazioni del magnete come da progetto: Deformazione misurata 18 mm Deformazione attesa dopo installazione camere a mu e servizi:24-26 mm Predeformazione 30 mm (da FEA) M. Livan - CSN1 - Roma

  3. Schedule 7.09 (Early 2006) M. Livan - CSN1 - Roma

  4. Inserimento pixel spostato a Febbraio 2007 (era Ottobre 2006) Schedule 7.09 (End of installation) M. Livan - CSN1 - Roma

  5. News from the ATLAS Overview week • Approvazione da parte del Collaboration Board della partecipazione dei due gruppi di Bologna ad ATLAS e del loro programma scientifico. • Due nuovi meetings dei National Contact Physicists (metà marzo e metà settembre) per discutere con adeguato anticipo con M. Nordberg le tabelle da presentare al RRB di Aprile ed Ottobre. M. Livan - CSN1 - Roma

  6. Documenti RRB- Lessico Baseline: Costi riferiti al MoU CtC: Costo necessario al completamento di ATLAS (68.2MSF) Construction Cost (CC) : equivalente a CORE A-B Construction & Integration (C&I): Costi di integrazione A-B M&O: Maintenace & Operation: consumi (pit, integrazione, TB (minimale)) M. Livan - CSN1 - Roma

  7. 468 (MoU)+ 68 (extra) -14 (deferrals) Stima dei contributi B e A Cash flow( CERN-RRB-2005-100) NB: la somma finale a 0 è una speranza di unitarieta’! ma..... M. Livan - CSN1 - Roma

  8. Cash flow (2) ATLAS managed to avoid the looming cash crisis in 2005, but it has shifted to 2006 The Collaboration is facing a cash flow problem for next year, reaching a maximum of - 12 MCHF if FAs concerned do not catch up with late payments M. Livan - CSN1 - Roma

  9. C&I A-B & CC B2006 CERN-RRB-2005-100-Part2 C&I-A (Table 12) C&I A riguardano i CP e sono dominati da: operazioni di assemblaggio dei magneti ECT la criogenia esterna al punto1 e i compiti integrazione sotto responsabilita’ del TC. Bilancio 632 kFs (INFN : 205 kFs) C&I-B(Table 12) Riguardano tutte le operazioni di integrazione dei singoli sottosistemi. prima della istallazione in caverna: Es. LAr EC’s, assemblaggio ID in SR1 etc. Bilancio 421 kFs ( INFN: 262 kFs ) CC-B (Table 14) Completion Cost dei sottosistemicome da programma Bilancio 654 kSf (INFN: 253 kFs) M. Livan - CSN1 - Roma

  10. CtC- A &B 2006 Secondo il piano temporale gia’ approvato per complessivi 4.0 MFs M. Livan - CSN1 - Roma

  11. Profilo temporale CtC e ripartizione A-B M. Livan - CSN1 - Roma

  12. M&O 2005 ( CERN RRB-2005-101) • Base: Memorandum M&O (1/05/2002-31/12/2011) • -A si riferiscono ai CP : Magneti e criogenia, TDAQ, TC • Discusso dallo “ scrutiny group”. • Richiesta 2006: 9,395 kSf • La divisione si basa sugli autori “PHD” : • 2006 : 145/1320 = 11.0% • 2005 : 150/1328 = 11.3% • 2004 : 144/1301 = 11.0% • -B si riferiscono ai sottositemi • discussi negli IB. RRB “ prende visione” • Richiesta 2006: 4,370 kSf • -C Covered by Cern as host lab M. Livan - CSN1 - Roma

  13. M&O 2005 ( CERN RRB-2005-101) • M&O Category A • Cryogenics & Detector operations 3.738 MCHF • Core computing (infr. & services) 1.445 MCHF • Software process service, Central production and operation • Secretariat & Communications 0.310 MCHF • Online computing 0.810 MCHF • DCS, Software licenses • Test beams, facilities 0.250 MCHF • Magnet cryo op. in bldg. 180, Online support, TDAQ electronics • Laboratory operations 0.075 MCHF • Assembly areas, workshops, TDAQ Lab equipment • General Services 2.767 MCHF • Heavy handling, Technical support, storage, survey, outreach • TOTAL 9.395 MCHF • Contributo italiano al Core computing: 1.7 FTE in kind (155 kCHF a 88 kCHF/FTE). Trovati ad oggi 1.4 FTE. Contatti in corso per il rimanente. M. Livan - CSN1 - Roma

  14. M&O evoluzione The M&O planning is shown in the figure (red curve as of the Oct. 2005 RRB) This includes now from 2006 onwards the Cat. A core computing services and infrastructure part (16 FTE, 1.4 MCHF), as defined in the Addendum #1 to the M&O MoU For the years 2002 – 2004 about 94% of the contributions were made (a procedure is in discussion at the CB how to treat late-payers) M. Livan - CSN1 - Roma

  15. M&O dettaglio (table 2) (*) Il totale della tabella RRB comprende il costo del power per i non member states M. Livan - CSN1 - Roma

  16. Spares transparencies

  17. MOF-B Summary • I MOF sono regolati dall’ apposito MOU (RRB-2002-035) valido fino al 31/12/2011. • -La divisione tra gli istituti dei MOF-B dipende dai singoli sottosistemi. • I MOF-A si riferiscono alla Maintenance dei Common Projects • I MOF-B si riferiscono alla maintenance di routine dei sottosistemi compresa la sostituzione di parti. • Seguono: • Tabelle cumulative 2002-2010 • Tabella contributi INFN 2002-2010 M. Livan - CSN1 - Roma

  18. MOF-B Contributi totali • Osservazioni: • Fino al 2005 una parte • rilevante era per TB • Nel 2006 la richiesta è circa il 50% di quella asintotica,raggiunta dal 2007 • La % asintototica (2010) sul valore CORE del rivelatore (MOU) è in media il 3% M. Livan - CSN1 - Roma

  19. MOF- B Contributi INFN • Il contributo asintotico • sarà di circa 900kCHF/Y • - Il valore CORE è quello del MOU M. Livan - CSN1 - Roma

  20. C&I, CC and CtC (in CHF) L’ INFN ha deciso nel 2002 di contribuire ai sovracosti di ATLAS con 4MCHF su un totale calcolato di 6.8MCHF. Contemporaneamente è stata decisa una suddivisione tra I contributi di tipo A e quelli di tipo B e una loro distribuzione nel tempo. M. Livan - CSN1 - Roma

  21. Bilancio 2006 CtC . Suddivisione tra i sistemi (in CHF) M. Livan - CSN1 - Roma

  22. C2C e M&O B (Pixel) Quote C2C e M&O B (2006) • M&OB 200kCHF = 134k€ aumento legato all’attivita’ di integrazione in SR building • C&I (31 kCHF = 21 k€): • C-C (80 + 5 kCHF = 53.3 +3.3 k€) M. Livan - CSN1 - Roma

  23. M&O-B (Pixel) Quote M&O-B (2006) • M&O B 2006 134 k€ • Dettaglio IDGEN (kCHF) • 120 SR1 • 120 cooling + fluid • 120 environ. Gas • 75 stores • 630 manpower • Dettaglio Pixel (kCHF) • 100 System test • 55 Extra Integraz. SR1 • 95 Spare off detec. electr. • 25 Stores • 120 manpower M. Livan - CSN1 - Roma

  24. MOF-B LAr 2006 I MOF-B del LAr coprono i consumi previsti per rendere operativi il calorimetro Barrel e i due calorimetri End-Cap. I costi coprono fino all’uscita delle FEB. Inoltre vengono mantenute le attrezzature basilari del TB (50kSF) Meccanica e elettronica (componentistica e lavorazioni) 80 Criogenia on detector, TB 70 Liquidi (FEB) e gas 25 Implementazione laboratorio elettronica 130 Generici ( impalcature, trasporti,assicurazioni, GMS,..) 35 Saldatori, cranes, engineering, personale tecnico 410 Totale 750 M. Livan - CSN1 - Roma

  25. Revised M&O B (Muons) • Scrutiny Committee interno al Muon System (Chair M. Livan) per la revisione degli M&O B per gli anni 2006-2010 (le stime erano del 2001) • Riduzione di 1 MCHF (!!!!!) per gli spares dell’ elettronica di FE (pagati sul budget CORE ed in parte tramite l’agreement CERN-Israele) • Aumento da 85 kCHF a 342 kCHF del costo del gas per alimentare le camere nel pit nel 2006 • Sistema finale del gas non disponibile se non nel corso dell’anno (dewars, sistemi di ricircolo) • Parziale uso di bombole premiscelate • Stima dal 2007 in poi confermata da S. Palestini e dal Gas Group (dettagli disponibili) • Nel 2004 incassati e spesi 200 kCHF M. Livan - CSN1 - Roma

  26. Old M&O budget M. Livan - CSN1 - Roma

  27. Revised M&O budget (07/2005) M. Livan - CSN1 - Roma

  28. MOF (B) (Tiles) sviluppo temporale Anno M&O (KchF) Nuove stime La prime versione dei costi di M&O era stata fatta nel 2002. Sono state riviste nel 2005 in modo piu’ realistico e con la nuova schedula di LHC. Stime precedenti: M. Livan - CSN1 - Roma

  29. MOF (B) (Tiles) • La valutazione fatta nel 2002 prevedeva per il 2006 un costo di MOF(b) di 625KChF, la parte INFN e’ del 7.6% pari a 47.5 KChF. Questa cifra e’ stata rivista alla luce della esperienza avuta con la strumentazione e installazione di TileCal, da uno scrutiny grup a cui ha partecipato anche N.Del Prete. • Lo scrutiny group ha modificato queste stime (2006) in 371KChF, la parte INFN e’ di 28.2KChF. • Il breakdown delle spese: • 41% maintenance (<3% CORE) • 33% manpower • 15% e-pool rentals • 10% spare parts, store items M. Livan - CSN1 - Roma