130 likes | 256 Views
E05-115 experimental setup in JLab Hall C (2009). HES HKS meeting. 22 Nov 2010 T.Gogami. Contents. EDC Residual Tracking EHODO parameter. EDC residual. Tracking code Drift time , distance EHODO. Run : 76321 (CH 2 target). σ ≈ 250 [μm]. σ ≈ 300 [μm]. EHODO timing.
E N D
E05-115 experimental setup in JLab Hall C (2009) HES HKS meeting 22Nov 2010 T.Gogami
Contents • EDC Residual • Tracking • EHODO • parameter
EDC residual • Tracking code • Drift time , distance • EHODO Run : 76321 (CH2 target) σ ≈ 250 [μm] σ ≈ 300 [μm]
EHODO timing Not so bad TDC of EHODO2 cannot be seen with current rev. Need to be checked
xFP vs. Residual The center doesn’t match !
Pos. at EHODO1 BLUE→ Hit only EHODO15 BLUE→ Hit EHODO15 These stripe structure caused by multi-hit (between segments) ちなみにthe center doesn’t match.
Mystery 1 Large residual [cm] [cm]
Mystery 2 [cm] HES track chi-square Large chi-square
Summary and to do • Summary • EDC tracking • Large chi-square • Large residual • EHODO multi-hit between segments • to do • POSI • Analysis • Residual of chambers for each arm. • HES tracking • Strangeness 2010 in KEK • Preparation