1 / 6

Joseph Krushinski Visual resume prepared for GPA interview Aug 4, 2009

Joseph Krushinski Visual resume prepared for GPA interview Aug 4, 2009. WFGD Commissioning, Spring 2009. Atrita Coal Pulverizor, Nov 2008. Images are grouped to correspond to experience list on resume. Wet Flue-Gas Desulphurization startup; Spring 2009.

amiel
Download Presentation

Joseph Krushinski Visual resume prepared for GPA interview Aug 4, 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Joseph Krushinski Visual resume prepared for GPA interview Aug 4, 2009 WFGD Commissioning, Spring 2009 Atrita Coal Pulverizor, Nov 2008 Images are grouped to correspond to experience list on resume

  2. Wet Flue-Gas Desulphurization startup; Spring 2009 Two units feed into one scrubber that provides ~780 mW of desuphurization Guillotine Isolation Damper Absorber DCS I/O box

  3. Riley Atrita Coal Pulverizer Rebuild; Fall 2008 Fall outage rebuild of coal mills in below freezing weather Duplex Atrita coal mill with cover off Picture inside boiler showing burners; wall fired unit

  4. Selective Catalytic Reduction (SCR) commissioning, Fall 2008 SCR installed on 700 mW unit to provide greater than 80% NOx removal rate SCR, image from babcock.com Gas analyzers (CEMS) ID (induced draft) fan refit: 9500hp Friendly Boilermaker Coal pile for 2200mW total capacity Large clinker

  5. Possum Point Power Plant; Summer 2005 • Combination of generating capacity • 2+1 550mW combined cycle • 850mW #6 LSFO • 150mW & 300mW converted nat gas from coal Combined cycle on left, other units on right (img from dom.com) 850mW turbine generator Combined cycle with Vogt HRSG Boiler feed pump fluid coupler inspection

  6. Marine survey/consulting; Spring 2005 GE Aircraft Engines; Spring 2004 Mitsubishi twin turbo containership engine GE 90 aircraft engine Land/marine aero-derivative engine

More Related