LANL’s Implementation of LANMAS. Los Alamos National Laboratory Benny J. Martinez Michael Kaufman Randy Fraser. Background. Previous Nuclear Material Tracking System (MASS) Over 20 years old No on-site technical support Number of users Over 280 users Hardwired infrastructure
E N D
LANL’s Implementation of LANMAS Los Alamos National Laboratory Benny J. Martinez Michael Kaufman Randy Fraser Los AlamosNationalLaboratory LA-UR 10-02748
Background • Previous Nuclear Material Tracking System (MASS) • Over 20 years old • No on-site technical support • Number of users • Over 280 users • Hardwired infrastructure • Direct Modem and STU-III access • Security plan expiring Los Alamos National Laboratory LA-UR 10-02748
Path Forward • Build • Cost of developing new NMTS • Time frame to develop new NMTS • Use existing DOE approved system (LANMAS) • Develop Site-Specific modules Los Alamos National Laboratory LA-UR 10-02748
LANMAS ImplementationPhase I (FY 2009) • Los Alamos Nuclear Control and Accounting System (LAMCAS) • LANMAS core • 18 months from time of funding to implementation which included: • Gap analysis • Security Plan • QA Process • Development • Purchase and setup of hardware • Testing • Data Migration Los Alamos National Laboratory LA-UR 10-02748
LANL-Specific Modules Required • Historical View • Historical 741 Shipment and Receipts • Historical Remarks • Site-Wide Rollup • LANL Specific Reports • Measurement Control • Data Feeds • Current Inventory • Historical Transactions • Material at Risk (MAR), etc • Cost Accounting Los Alamos National Laboratory LA-UR 10-02748
LAMCAS Overview Los Alamos National Laboratory LA-UR 10-02748
LAMCAS Infrastructure Los Alamos National Laboratory LA-UR 10-02748
Data Migration Los Alamos National Laboratory LA-UR 10-02748
LAMCAS Data Los Alamos National Laboratory LA-UR 10-02748
LAMCAS User Interface Los Alamos National Laboratory LA-UR 10-02748
QA Process • Project Plan • Requirements • Software Design Document • Test Plans • Test documentation • User Guides Los Alamos National Laboratory LA-UR 10-02748
Training • Diverse set of users • Super Coders • Knowledgeable set of MC&A users • Full time job • Operational set of users • Part time • Many ways of doing the same function • Just in time training • Continuous training • Quick Reference reminders Los Alamos National Laboratory LA-UR 10-02748
LANMAS Customization • LANMAS • Plug-Ins • Allows users to view and edit Remarks in LANMAS • Set Attractiveness Level by SMT/IDC to meet LANL’s requirements for MIX/SPLIT/ADJUSTMENT • Peer Review turned on • AssayMethod used to track type of instrument used to measure material • ADMIN/Gridset • For each LANMAS form display fields that are of used by LANL • ADMIN/Security • Create >100 User groups to manage security permissions Los Alamos National Laboratory LA-UR 10-02748
Lessons Learned • Training • Just in time training/re-training • Security Plan Approval • Time and effort to get approved • Deployment infrastructure model • Secure Desktop on Demand (Thin client environment) • Data Migration issues • LSAuto versus direct insert into LANMAS Los Alamos National Laboratory LA-UR 10-02748
Lessons Learned (Cont.) • Cyber security requirements • Separation of duties • System Administrators • Database Administrators • MC&A LAMCAS Operations • Single point of contact for all issues • LAMCAS Operations • Great LANMAS Support Los Alamos National Laboratory LA-UR 10-02748
Phase II (FY 2010) • Physical Inventory Module • Label printing Barcodes • Statistical Sampling for Item Monitoring • Measurement Control enhancements • Data Feed Option for Statisticians • Trending enhancements • Inventory Evaluation • From-To Trace • Propagation of Variance (POV) Data Feeds • Process Monitoring • Exception reports • Automated roll-up calculation • Outside TA-55, CMR • Classified Beta System • Procure and install classified test environment Los Alamos National Laboratory LA-UR 10-02748
Phase III (FY 2011) • Maintenance • LANMAS 3.3 • SQL Server 2008 R2 • LAMCAS Visual Studio 2010 and 3rd party tools • On-going support • Responding to new requirements • MAR • Phase II MAR Tracker Interface • COST • Create new LANL COST module • Update SRS COST module with updated version • Automate Physical Inventory process • Portable Barcode Scanners, Reconciliation • Process Monitoring • Reports • POV Automation • Automate TID inventory • Portable Barcode Scanners, Reconciliation • Measurement Control • Trending • WCATS • Create interface to automate waste shipments Los Alamos National Laboratory LA-UR 10-02748
Summary • Change is Hard • System is operational • Training is on-going • Continue to add functionality • Different users require different views of the data Los Alamos National Laboratory LA-UR 10-02748