1 / 43

Idaho Water Supply Committee Meeting January 13, 2011 By Art Hill Hydraulic Engineer

Idaho Water Supply Committee Meeting January 13, 2011 By Art Hill Hydraulic Engineer. 2011 Water Operations. Upper Snake River System Teacup Upper Snake River Carryover Storage 2011 Storage Supply Reservoir by Reservoir Storage Unregulated flows into Jackson Lake

amma
Download Presentation

Idaho Water Supply Committee Meeting January 13, 2011 By Art Hill Hydraulic Engineer

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Idaho Water Supply Committee Meeting January 13, 2011 By Art Hill Hydraulic Engineer

  2. 2011 Water Operations • Upper Snake River System Teacup • Upper Snake River Carryover Storage • 2011 Storage Supply • Reservoir by Reservoir Storage • Unregulated flows into Jackson Lake • Precipitation Probabilities & Drought Outlook • Current SWE & Precipitation • January 1, 2011 Forecast

  3. Major Storage Reservoirs in the Upper Snake River BasinUpper Snake River system (Jackson Lake, Palisades, Grassy Lake, Island Park, Ririe, American Falls, Lake Walcott) is at 64% of capacity. Total space available: 1,463,273 AF with a Total storage capacity: 4,045,695 AF

  4. The End

More Related