1 / 12

Title

Title. Beam clipping Problems in GEO 600 ??. Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut). Stefan Hild Ilias WG1 meeting, June 2005. Introduction. After installation of new Power Recycling mirror less light power was observed than expected:

amory
Download Presentation

Title

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Title Beam clipping Problems in GEO 600 ?? Max-Planck-Institut für Gravitationsphysik(Albert-Einstein-Institut) Stefan Hild Ilias WG1 meeting, June 2005

  2. Introduction • After installation of new Power Recycling mirror less light power was observed than expected: • Hypothesis: Mode matching into PR cavity is not too bad (?) • Hypothesis: beam is clipping somewhere inside the cavity • Expected (simulations)  4.5 kW • Measured  1.5 kW

  3. Simple model cavity Simple model: 2 mirror cavity, 1.7 W incident, T1 = 900ppm, T2 represents losses expected reality Intracavity power [W] reflected power [W] Losses in cavity overcoupled undercoupled Looking for intracavity losses of the order of 500 ppm

  4. Power Recycling reaction mass CCD Clearly much light on the reaktion mass, but at least beam seems to be centered (in respect to the reaction mass) Main beam CCD

  5. Potential clipping spots in TCC north arm MPR east arm dark port

  6. Power Recycled Michelson Used HeNe-Laser from endstadions to project the free aperture onto MPR reaction mass. Result: no clipping inside the power recycling cavity

  7. Signal Recycling cavity We definitely see clipping between beamsplitter and MSR (see blue line) Side note: there is also clipping on MSR reaction mass. HeNe from far end locked DRMI

  8. Smoking gun: BDBSs1 CCD Suspect the beam to clip the beam dump (blue arrows)

  9. E n d

  10. Misalignment of MSR

  11. Dark port image

  12. Strange beam pattern @ MFE

More Related