UNC Modification Proposal 0362. Chris Warner Network Code Manager. Overview of Issue. CSEP NExA (Annex A Part 5) requires iGTs to issues reconciliation volumes (in respect of CSEP Larger Supply Points) to the upstream Distribution Network

amos-guzman
Download Presentation

UNC Modification Proposal 0362

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UNC Modification Proposal 0362 Chris Warner Network Code Manager

  2. Overview of Issue • CSEP NExA (Annex A Part 5) requires iGTs to issues reconciliation volumes (in respect of CSEP Larger Supply Points) to the upstream Distribution Network • CSEP NExA restricts the meter readings that can be utilised for reconciliation to “Valid Meter Readings” • “Valid Meter Readings” (UNC TPD M3.1.4) do not include • estimated (‘notional’) Opening Meter Readings provided by the DN (UNC TPD M3.8.5) • Agreed Opening Meter Readings (UNC TPD M3.8.7) • iGTs and Users have highlighted this as a key reason why there is a lack of reconciliation volumes submitted in respect of CSEP Larger Supply Points. • risks associated with unreconciled energy and Transportation charges

  3. UNC Terms for DN Connected Supply Points • “Valid Meter Readings” (UNC TPD M3.1.4) do not include • estimated (‘notional’) Opening Meter Readings provided by the DN (UNC TPD M3.8.5) • Agreed Opening Meter Readings (UNC TPD M3.8.7) • However • estimated Opening Meter Readings can be used for Individual NDM Reconciliation (UNC TPD M3.8.5(a)); and • Agreed Opening Meter Readings can be used for Individual NDM Reconciliation (UNC TPD M3.8.8(c))

  4. Proposed Change to CSEP NExA Annex A Part 5 • UNC Modification Proposal 0362 • Proposes to extend scope of Meter Readings eligible to be utilised to generate reconciliation volumes. In addition to ‘Valid Meter Readings’: • Estimated Opening Meter Readings; and • Agreed Opening Meter Readings • Would be consistent with UNC terms • Proposal was considered by UNC Modification Panel on 17 February 2011 • Subject to Self Governance provisions • Referred to Distribution Workgroup

  5. Benefits • As at January 2011 • 3,995 live LSP LMNs • 1,569 (39%) with some reconciliation activity • 2,426 (61%) with no reconciliation activity • 6,159 closed LSP LMNs • 3,238 (53%) with some reconciliation activity • 2,921 (47%) with no reconciliation activity • How much additional energy / periods could be reconciled if estimated Opening Meter Readings and Agreed Opening Meter Readings could be used for reconciliation? • UNC 0362 would be enhanced by quantification of this benefit • As a guide, Xoserve is identifying volume of online reconciliation using the two read types