Drop Testing Update - MCO and 24-Inch ISFP Test Canisters. T. J. Hill / NSNFP Technical Lead. April 2005. Drop Test Efforts. Two 24-Inch Idaho Spent Fuel Project (ISFP) test canisters (modified versions of the standardized DOE SNF canister design) dropped 30 feet:

anahid
Download Presentation

Drop Testing Update - MCO and 24-Inch ISFP Test Canisters

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Drop Testing Update -MCO and 24-Inch ISFP Test Canisters T. J. Hill / NSNFP Technical Lead April 2005

  2. Drop Test Efforts • Two 24-Inch Idaho Spent Fuel Project (ISFP) test canisters (modified versions of the standardized DOE SNF canister design) dropped 30 feet: • 45-degree impact (24MOD-45-1) • 70-degree impact for slapdown (24MOD-70-2) • Two MCO test canisters dropped using repository drop criteria from WASRD, Rev 4: • 23-foot vertical drop (MCO-00-1) • 2-foot 60-degree (worst orientation) drop (MCO-60-2)

  3. MCO 23-ft Drop Test

  4. Pressure Testing – Post Drop • Two ISFP test canisters (24MOD-45-1 and 24MOD-70-2) • Held greater than 50 psig air steady for 1 hour • Two MCO test canisters (MCO-00-1 and MCO-60-2) • Held greater than 50 psig air steady for 1 hour

  5. Helium Leak Testing – Post Drop • Two ISFP test canisters (24MOD-45-1 and 24MOD-70-2) • Helium leak tested less than 1x10-7 std cc/sec (leaktight) • Two MCO test canisters (MCO-00-1 and MCO-60-2) • MCO-00-1 not greater than 1x10-5 std cc/sec (alternate test method due to prior internal helium contamination) • MCO-60-2 less than 1x10-7 std cc/sec (leaktight)

  6. MCO Internal Helium Contamination

  7. ISFP Test Canister Deformations • Good analysis matches to actual deformations and strains • Typically within 4% on deformations • Good matches with measured strains

  8. ISFP Test Canister Deformations - cont. • No internal sleeves were used • Localized “bumps” in shell due to internals • Analysis accurately predicted these deformations within 2%

  9. MCO Test Canister Deformations - cont. • Good analysis matches to very small actual deformations and strains

  10. ISFP Test Canister Internals • No significant damage to ISFP internals

  11. MCO Test Canister Internals • Only MCO-00-1 was cut open and only bottom basket was of interest ComponentOriginal DimensionPost-Drop DimensionModel Predicted Dimension Center Post Length 29.278-in. 25-1/8-in. 25-5/16-in. Center Post Diameter 2.840-in. 3.047-in. 3.025-in. Basket cuts are from canister cutting efforts

  12. MCO Test Canister Contamination • Radioactivity readily measured once top end of test MCO-00-1 cut off (tape applied after cutting open to prevent potential spread of contamination from holes) • Disposed as low level waste at INL with less than 0.5 mr/hr reading

  13. Conclusion • NSNFP issued two reports • EDF-NSNF-045 for ISFPs • EDF-NSNF-047 for MCOs • NSNFP has demonstrated these DOE SNF canisters will not breach during repository defined drop events