SOUTH BRUNSWICK HIGH SCHOOL AQUACULTURE PROGRAM

SOUTH BRUNSWICK HIGH SCHOOL AQUACULTURE PROGRAM. DIRECTED BY: MR. BARRY BEY. 2002-2003 South Brunswick Aquaculture Classes I -III. AQUACULTURE II AND III FOR PICTURE DAY. THE NEW BREED OF AQUACULTURE STUDENTS. WHAT WE’VE ACCOMPLISHED. #1. ACHIEVEMENTS.

analu
Download Presentation

SOUTH BRUNSWICK HIGH SCHOOL AQUACULTURE PROGRAM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SOUTH BRUNSWICK HIGH SCHOOL AQUACULTURE PROGRAM DIRECTED BY: MR. BARRY BEY

  2. 2002-2003 South Brunswick Aquaculture Classes I -III

  3. AQUACULTURE II AND III FOR PICTURE DAY

  4. THE NEW BREED OF AQUACULTURE STUDENTS

  5. WHAT WE’VE ACCOMPLISHED #1

  6. ACHIEVEMENTS

  7. $2,000.00 CHECK DONATED BY U.S OPEN KING MACKEREL TOURNAMENT

  8. THE IRON REMOVAL SYSTEM

  9. THE SYSTEM

  10. HEAD TANK COLUMN AND BIO BALLS STORAGE TANK SAND FILTER THE DIFFERENT PARTS TO OUR NEW SYSTEM PUMP

  11. WHAT CONTROLS THE IRON REMOVAL SYSTEM

  12. THE WELL HEAD !!!

  13. CONCRETE PAD AT WELL SITE

  14. COMPLETED CONCRETE PAD

  15. THE FISH FARM

  16. AT THE FISH FARM

  17. THE PONDS

  18. THE RESERVOIR

  19. STORAGE SHED

  20. THE PLANS FOR OUR NEW SHOP

  21. BLUEPRINTS FOR THE NEW FACILITY

  22. BLUEPRINTS FOR THE NEW SYSTEM

  23. HOW IT TURNED OUT

  24. NEW GARAGE DOOR

  25. TRUCK ACCESSIBLE

  26. NEW PLUMBING FOR SEMI-CLOSED SYSTEM

  27. PLUMBING FOR OUR SEMI-CLOSED SYSTEM TANKS

  28. OVER HEAD PLUMBING FOR THE NEW FACILITY

  29. GROUND PLUMBING FOR THE SEMI-CLOSED SYSTEM

  30. FILTRATION SYSTEM FOR THE SEMI-CLOSED SYSTEM

  31. FILTRATION SYSTEM

  32. COPPER PIPE FOR COUNTY WATER

  33. NEW !!! SPAWNING TROUGHS

  34. NEW STANDS FOR OUR TANKS

  35. NEW DRAIN SYSTEM

  36. ON THE JOB

  37. THE SALTWATER TANKS

  38. SALTWATER TANKS!!

  39. PLUMBING FOR THE SALTWATER TANK

  40. THE PARTS TO THE SALTWATER TANK

  41. SALTWATER SPECIMENS

  42. WHAT’S NEW TO OUR PROGRAM

  43. THE NEW COMPUTER LAB FOR OUR NEW STATE OF THE ART FACILITY !!!

  44. TO PREVENT BAD THINGS FROM HAPPENING, WE WORK IN TEAMS. TEAMWORK REALLY DOES WORK.

  45. OUR NEW GATEWAY PROGRAM !!!

  46. MR. BEY AND OUR NEW AQUACULTURE GATEWAY STUDENTS

  47. WE ARE NOW ABLE TO LOOK THROUGH THE CLASS INTO THE LAB WITHOUT ALL THE NOISE !!!

  48. MISCELLANEOUS

  49. AQUA ART !