An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HOLLYWOOD / WESTERN STREETSCAPE GUIDELINES April 22, 2010

  2. HOLLYWOOD / WESTERN Kathryn Cerra Associates, Landscape Architects Kathy Cerra Ana Tabuena

  3. HOLLYWOOD / WESTERN PROJECT LIMITS: • Hollywood Boulevard, Gower to Western • Western Avenue, Franklin to Santa Monica

  4. PROCESS • Gather information • Reach out to interested participants • Hold a community Workshop • Establish project goals • Create Draft Streetscape Plan • Meet with community to share Streetscape Plan; Revise as needed • Final Plan Review with Community

  5. STREETSCAPE GOALS • Make sidewalks and neighborhood safer • Improve “walkability” of sidewalks • Improve appearance of district • Bring some of the Hollywood Blvd “walk of fame” glamour to east of Gower

  6. HOLLYWOOD BLVD

  7. HOLLYWOOD BLVD

  8. HOLLYWOOD & WESTERN

  9. WESTERN & FRANKLIN

  10. STREET TREES: HOLLYWOOD OPT 1

  11. STREET TREES: HOLLYWOOD OPT 2

  12. STREET TREES: HOLLYWOOD BLVD

  13. STREET TREES: WESTERN OPT 1

  14. STREET TREES – WESTERN OPT 2

  15. SIDEWALK PAVING Sidewalk between corners: plain concrete with colored concrete bands 8’ on center At corners, colored concrete with inlay detail

  16. SIDEWALK PAVING Sidewalk Enhancement At All Corners: Colored, scored concrete withbrass stars inlaid randomly To echo the Walk of Fame on walks west of Gower

  17. CROSSWALK PAVING Western Ave: Shall it share the “Star” pattern or should it have a different crosswalk design? “Star” pattern on all Hollywood Blvd crosswalks: 5 – point star to be developed with Integrated Paving Company designers

  18. INTERSECTION PAVING At GATEWAY Intersections install decorative asphalt paving, including at Hollywood/Gower Hollywood/Bronson to Van Ness (Freeway Gateway) Hollywood/Western Western/Franklin

  19. PEDESTRIAN LIGHTING Hollywood’s original pedestrian light fixture If fixtures are added, they would be maintained by the City through a new street lighting assessment

  20. BUS SAFETY LIGHTING Bureau of Street Lighting approved fixtures Lamp is high pressure sodium (LED to become available) Two fixtures may be placed at a bus zone and will be maintained by City staff

  21. EXISTING STREET LIGHTING • PAINT EXISTING GRAY FIXTURES BLACK TO MATCH COLOR OF LIGHT POLES ON HOLLYWOOD BLVD WEST OF GOWER • ADD HANGING FLOWER BASKETS ON HOLLYWOOD BLVD FROM BRONSON EAST TO WESTERN • PAINT LIGHT FIXTURES ON WESTERN NAVY BLUE

  22. BUS SHELTERS

  23. BUS SHELTERS

  24. HANGING BASKETS

  25. PLANT CONTAINERS

  26. BENCH & LITTER RECEPTACLE

  27. TIER 1 MAINTENANCE:

  28. TIER 2 MAINTENANCE:

  29. TIER 2 MAINTENANCE:

  30. NEXT STEPS • June 27: Final Streetscape Guidelines presentation to Community • Final City staff reviews • Revisions as needed • Final documents to Council Districts 4 and 13 to be used for Grant Applications