20 likes | 231 Views
News – 24 November 2010. 7 th – 8 th December: VELO Upgrade Electronics workshop in Oxford 7 th : Readout chain (Jan Buytaert) 8 th : Hybridisation and Module 0 issues (Val O’Shea and Tony Smith)
E N D
News – 24 November 2010 • 7th – 8th December: VELO Upgrade Electronics workshop in Oxford • 7th: Readout chain (Jan Buytaert) • 8th: Hybridisation and Module 0 issues (Val O’Shea and Tony Smith) • Testbeam 2011: combined LHCb request and possible sharing of resources. 3 periods requested and semi permanent installation. Meeting on Friday of LHCb week organised by Eric Thomas • Very good progress on portable CO2 cooling system • Please read and comment on LOI
Status of 2009 paper (some movement) • https://gligorov.web.cern.ch/gligorov/timepixpaper.pdf(old version) • Thanks to our heroic editor Vava! (no need to polish your figures etc. he will do this) • Status of the sections: • Timepix chip description (RP) • Timepix Telescope description (RP) • Determination of calibration parameters and threshold (group effort) • Clustering algorithm & results (PC, VG, ZX) • Tracking (PC) • Alignment (PC,JG) • Track Pointing Precision (PC) • Data Sets (PC) • Determination of zero angle (ZX) • General Cluster characteristics(PC) • Landau distributions in DUT (Syracuse) • Efficiency and noise as a function of threshold (HG) • Timewalk(MvB) • Pulseshape(PC) • HV Scans (Syracuse) • Angle Scans – clusters (Syracuse) • Angle Scans - resolutions (PC) • 45 degree data angle scans PC) • Row column asymmetries(TM, FB) • Ikrum scans (DH) • 3d sensor (GS) Text and plots exist Plots exist – text on the way Work to do